Mature fields
The fields have produced for decades, so work centres on rehabilitation, maintenance and well work; a BP redevelopment contract was finalised in 2025.
Kirkuk is the centre of northern Iraq's oil industry; the Baba Gurgur discovery in 1927 launched exports from the Kirkuk field. The Baba and Avanah domes and the adjacent Bai Hassan, Jambur and Khabbaz fields are operated by the North Oil Company. If you are specifying an ATEX and IECEx smartphone for Kirkuk, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Kirkuk: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Kirkuk: Wellheads and gathering stations, Gas processing, Crude pumping and pipeline facilities | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kirkuk. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The fields have produced for decades, so work centres on rehabilitation, maintenance and well work; a BP redevelopment contract was finalised in 2025.
Access to oilfield sites is normally by operator-issued permit, so plan visits and deliveries ahead.
Kirkuk has a diverse population of Kurds, Iraqi Turkmen and Arabs, so crews and local contractors may work in Arabic, Kurdish or Turkmen, and clear multilingual instructions help.
BP signed a preliminary deal to develop the Kirkuk, Bai Hassan, Jambur and Khabbaz fields, which it estimates hold about nine billion barrels of recoverable oil, under a profit-sharing model.
Summers from May to October are very hot and dry with temperatures above 46 degrees Celsius, and dry dusty winds are common.
Telecom equipment sold in Iraq needs Communications and Media Commission type approval, with certificates valid for one year and a local partner involved.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Kirkuk. Work in Kirkuk centres on rehabilitation, maintenance and redevelopment of long-producing fields, which brings in international contractors alongside the North Oil Company. Their reviewers commonly ask for both ATEX and IECEx evidence for handhelds. A dual route avoids reworking paperwork per contractor. The IS-04Z1 has no certificate yet, as certification is in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are wellheads and gathering stations, gas processing, crude pumping and pipeline facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
The North Oil Company and any partner operators run site permits and supplier checks. Ask your sponsor for the current procedure and for the equipment approval list.
Older plants may have mixed equipment and documentation, so confirm the actual area classification and gas group before taking devices on site. The operator can supply current drawings.
Access to oilfield sites is normally by operator-issued permit, so visits and deliveries need advance planning. Agree the permit route with the operator or its contractor before shipping, and allow time for formal tender and approval steps. Confirm the process with the site operator.
More on Kirkuk, and on other places in Iraq.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.