Spread across regions
Refineries sit in the south-east, south, north-east and elsewhere, so logistics differ by site.
This is a regional grouping rather than a single site. Petrobras operates about ten refineries in Brazil, including Replan at Paulinia (415,000 barrels a day), Revap at Sao Jose dos Campos and Reduc at Duque de Caxias, each with classified process, storage and loading areas. This page explains what to look for in an ATEX and IECEx smartphone for Brazilian refineries, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Brazilian refineries: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Brazilian refineries: Refinery process units, Crude and product tank farms, Loading racks and jetties | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Brazil Refineries. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Refineries sit in the south-east, south, north-east and elsewhere, so logistics differ by site.
Planned maintenance shutdowns bring large contractor workforces into classified areas; Reduc, for example, has shutdowns scheduled in 2026.
At the Gabriel Passos refinery (Regap) in Betim, Minas Gerais, capacity of 166,000 b/d is being raised by 25,000 b/d with start-up planned for 2027, and sustainable aviation fuel production is being introduced.
The Abreu e Lima refinery in Ipojuca, Pernambuco, is being expanded with a new production line to refine heavy crude from the pre-salt region.
Of eight refineries once offered for sale, only two were sold (Mataripe and the Manaus refinery), and Petrobras later resumed investing in the rest of its refining park.
The same plan allocates 2.1 billion dollars to remove logistics bottlenecks, including expanding and optimising terminals and transport infrastructure that serve the refineries.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Brazilian refineries. Across Petrobras refineries such as Replan, Revap and Reduc, an HSE reviewer will want certificate evidence tied to Brazil's Inmetro-accredited certification route. A dual ATEX and IECEx route is designed to help international engineering firms during projects. The IS-04Z1 has no certificate yet.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are refinery process units, crude and product tank farms, loading racks and jetties, hydrotreater and hydrogen units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Refinery contractors typically check Ex certification marking, temperature class and gas group against the area classification, plus local radio approval. The detail varies by site and contractor, so confirm the requirement with the refinery safety group and your contractor induction pack.
Often. During shutdowns and revamps, work shifts between live and isolated units, and permits define which areas are gas-tested. Many sites keep the same Ex requirement for the whole fence line to avoid errors, so confirm with the operator and the turnaround contractor.
Maintenance shutdowns are a natural point, because large contractor workforces enter classified areas, and Reduc has shutdowns scheduled in 2026. Plan MDM enrolment and charging well before mobilisation. Confirm timing and rules with the site operator, as schedules change.
More on Brazil Refineries, and on other places in Brazil.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.