Turnaround cycles
Planned maintenance shutdowns bring large contractor workforces into classified areas; Reduc, for example, has shutdowns scheduled in 2026.
This is a regional grouping rather than a single site. The same plan allocates 2.1 billion dollars to remove logistics bottlenecks, including expanding and optimising terminals and transport infrastructure that serve the refineries. An ATEX and IECEx smartphone distributor in Brazilian refineries would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Brazilian refineries has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Brazilian refineries: Loading racks and jetties, Hydrotreater and hydrogen units, Flare and wastewater areas | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Brazil Refineries. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Planned maintenance shutdowns bring large contractor workforces into classified areas; Reduc, for example, has shutdowns scheduled in 2026.
Petrobras has sold some refineries (for example RLAM in Bahia and Reman in Manaus), so procurement rules differ by owner.
Under the Strategic Plan 2024-28+ Petrobras budgets 16.7 billion US dollars across refining, transport and marketing, with 9 billion dollars earmarked for refining, which implies a long pipeline of shutdown and revamp work.
Petrobras' REPLAN refinery at Paulinia, Sao Paulo, is the largest in Brazil at 434,000 barrels per day, and the 208,000 b/d REPAR refinery at Araucaria, Parana, is another major site in the 2024-28 plan.
Regap has a photovoltaic plant of 13,300 kW with about 20,000 solar panels, the first at a Petrobras refinery, and Petrobras plans 55.5 MW of solar capacity across its refining sites.
At the Gabriel Passos refinery (Regap) in Betim, Minas Gerais, capacity of 166,000 b/d is being raised by 25,000 b/d with start-up planned for 2027, and sustainable aviation fuel production is being introduced.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Brazilian refineries. Across Petrobras refineries such as Replan, Revap and Reduc, an HSE reviewer will want certificate evidence tied to Brazil's Inmetro-accredited certification route. A dual ATEX and IECEx route is designed to help international engineering firms during projects. The IS-04Z1 has no certificate yet.
A distributor for Brazilian refineries would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are refinery process units, crude and product tank farms, loading racks and jetties, hydrotreater and hydrogen units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Brazilian refineries.
Process units, pump areas, tank farms, loading racks and sample points commonly contain Zone 1 or Zone 2 gas areas, often gas group IIA or IIB with hydrogen areas in IIC. The refinery's area classification drawings are the authority, so request them before specifying handheld devices.
Current plans point to Replan, Repar, Regap, Reduc, RPBC and Abreu e Lima, with revamps, hydroprocessing and sustainable fuels projects announced. Timelines can shift, so treat them as indicative and confirm scope and schedule with the operator or its main contractors.
No. Petrobras has sold some refineries, for example RLAM in Bahia and Reman in Manaus, so procurement rules differ by owner. Purchasing is usually through registered-supplier processes. Confirm equipment approval and documentation requirements with the site operator and its HSE team.
Other guides for Brazil Refineries, other places in Brazil, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.