Climate
Desert conditions on the edge of the Empty Quarter, with high summer temperatures and dust.
Abqaiq is a town in Saudi Arabia's Eastern Province, about 60 km south-west of the Dhahran-Dammam-Khobar area. Commercial air travel uses King Fahd International Airport in Dammam, about 90 km from Abqaiq, which sets the practical transit time for visiting engineers. Distribution partners for Abqaiq are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Abqaiq has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Abqaiq: Utilities units, Hydrogen sulphide removal, Crude stabilisation units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Abqaiq. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Desert conditions on the edge of the Empty Quarter, with high summer temperatures and dust.
Aramco facilities are controlled-access sites; contractors work under Aramco's own safety and permit rules.
Abqaiq's growth followed the discovery of the Abqaiq oil field in 1940, which is why the town grew up around Aramco operations and housing.
The processing complex covers about 250 hectares, so inspection and maintenance rounds involve long distances between units on a single fenced site.
The Abqaiq to Yanbu natural gas liquids pipeline is described as Saudi Arabia's largest NGL line, carrying product west to Red Sea petrochemical plants.
Abqaiq has a station on the Dammam to Riyadh railway line, and a small Aramco-operated airstrip that is closed to commercial flights.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Abqaiq. At Abqaiq, Aramco reviewers dealing with hydrogen sulphide removal and crude stabilisation would want certificate evidence that traces cleanly to the equipment marking. A dual ATEX and IECEx route can help international contractors who work to both. The IS-04Z1 has no certificate yet; certification is in progress.
A distributor for Abqaiq would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are crude stabilisation units, natural gas liquids facility, utilities units, hydrogen sulphide removal. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Abqaiq.
King Fahd International Airport at Dammam is about 90 km away. Abqaiq's own airstrip is run by Saudi Aramco and is not open to commercial traffic, so visiting service teams normally fly to Dammam and continue by road under the host's transport rules.
Radio equipment supplied in Saudi Arabia is normally covered by Communications, Space and Technology Commission type approval, with certificates renewed periodically. Aramco sites may add their own device rules, so confirm both the national and the site requirement with your client.
Telecoms equipment conformity in Saudi Arabia has been handled through the SABER platform of SASO since February 2025, and the Communications, Space and Technology Commission is the telecoms regulator. These are separate from Ex certification. Ask the supplier for both, and check scope with the relevant authority.
More on Abqaiq, and on other places in Saudi Arabia.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.