RDMP upgrade
The Jakarta Post reported that the new residual fluid catalytic cracking unit was due to start in November 2025, with a naphtha unit following in mid-2026.
Balikpapan in East Kalimantan is the site of Pertamina's Refinery Unit V, operated by PT Kilang Pertamina Balikpapan. The RDMP upgrade is raising capacity from 260,000 towards 360,000 barrels per day, so process units and tank farms are Zone 1 areas. If you are specifying an ATEX and IECEx mobile phone for Balikpapan, East Kalimantan, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Balikpapan, East Kalimantan: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Balikpapan, East Kalimantan: Refinery process units, Residual fluid catalytic cracking unit, Crude and product storage | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Balikpapan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The Jakarta Post reported that the new residual fluid catalytic cracking unit was due to start in November 2025, with a naphtha unit following in mid-2026.
The project includes a single point mooring for very large crude carriers and two one-million-barrel crude tanks at Lawe-Lawe.
The Balikpapan and Lawe-Lawe Refinery Development Master Plan raised crude capacity from 260 to 360 thousand barrels a day and added a 90 thousand barrel a day residue catalytic cracking unit.
The refinery operator says it relies on technical staff with decades of petroleum-processing experience and works within Pertamina Group standards, so contractor induction typically follows Pertamina procedures.
The city has the largest economy in Kalimantan by GDP and is served by Sultan Aji Muhammad Sulaiman Sepinggan Airport, with Semayang as its main seaport, the second busiest in East Kalimantan.
Balikpapan is a seaport city on the east coast of Borneo and the financial centre of Kalimantan, with about 757,000 residents in 2023, making it the second most populous city in East Kalimantan.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Balikpapan, East Kalimantan. A Pertamina refinery reviewer in Balikpapan would want certificate evidence matched to markings, plus a schedule of conditions. For the IS-04Z1 that remains in progress. A dual ATEX and IECEx route helps the international contractors and EPC firms involved in the RDMP upgrade, who carry equipment records from other projects.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are refinery process units, residual fluid catalytic cracking unit, crude and product storage, marine crude mooring and tanks. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Oil and gas dominate the local story, with the refinery, fuel terminals and port tank storage. East Kalimantan also has coal and LNG activity regionally, but confirm with each operator which classified-area rules and device permits apply to its own facility.
Reasonably. The city has an international-class airport at Sepinggan and the Semayang seaport, and it is the main commercial centre of Kalimantan. Allow time for customs clearance and for any site gate checks on electronic devices entering the refinery.
Equatorial heat and constant humidity affect battery life, seals and charging habits. Check the rated operating temperature range and keep charging in a safe area, away from classified zones. IP68 is useful against rain, but it is not explosion protection.
Related guides for Balikpapan and for Indonesia.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.