Poland: background
Poland produced 78 megatonnes of hard coal and 57 megatonnes of brown coal in 2009, and a plan agreed in September 2020 aims to phase out coal by 2049.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for the refinery, fertiliser and gas terminal work where Polish teams actually meet an explosive atmosphere. Buyers searching for a rugged smartphone supplier for Poland can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. A rugged smartphone for Poland cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP65 to IP68 sealing | IP68 design |
| Drop and shock | A stated drop height onto concrete | Specification on request |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Poland: Police, Tarnów, Płock | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Poland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Poland market guide.
Poland produced 78 megatonnes of hard coal and 57 megatonnes of brown coal in 2009, and a plan agreed in September 2020 aims to phase out coal by 2049.
Poland's energy sector is the fifth largest in Europe, with an installed electricity capacity of about 61 GW at the end of 2024, so power plants and mines are large sources of classified areas.
In 2020 coal made up 69.5% of national energy production and 68.5% of electricity generation, so coal handling, bunkers and mills create combustible dust zones at many power sites.
PKN Orlen was created in 1999 by merging the state fuel retailer CPN with Petrochemia Płock, the firm running the Płock refineries, and has since grown into a multinational refiner and gas trader.
A rugged phone is built to survive water, dust, drops and rough handling, usually rated by an IP code and a drop specification. Ruggedness is an environmental property: it says nothing about whether a phone may be used where flammable gas or dust is present. That is decided by explosion-protection certification and marking.
The IS-04Z1 combines both: an IP68 sealed rugged build and a design for Zone 1 and Zone 21 (marking target Ex ib IIC T4). The explosion-protection certificates are in progress and none has been issued.
In Poland. Poland asks a device to hold up in a cold, wet outdoor round, and to be honest about where it may not go. IP68 sealing and a rugged build suit weather and wash-down at refinery and fertiliser sites. IP68 is not explosion protection, and the IS-04Z1 is Group II surface equipment.
Supply of the IS-04Z1 to Poland starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
It is designed to IP68 sealing, with glove-friendly controls. Ruggedness is not explosion protection: that depends on the certificates, which are in progress.
The market guide for Poland covers Płock, Gdańsk, Włocławek, Puławy, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Coal-fired power stations, including large brown coal plants such as Bełchatów, along with coal-using industry, handle bulk fuel that creates dust zones such as Zone 21 and Zone 22. Check that a device's dust group and temperature class match the site classification drawings.
ATEX separates Group I equipment for mining from Group II for surface industries, and underground methane and coal dust conditions differ from surface plant. Check the group marking on any device against the area and the mine operator's own approval procedure.
No. It is designed as Group II surface equipment, and underground coal mining is Group I, with a separate certificate for methane and coal dust. Do not take a Group II device underground. Refineries, fertiliser plants and gas terminals are the intended areas, subject to the site operator's classification.
More on Poland, and on other places in Poland.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.