Czech Republic: infrastructure
The Gazela pipeline connects Czech gas supply through Germany at Brandov or Rozvadov and through Slovakia at Lanžhot, so compressor and metering stations sit near the borders.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for Czech refineries, chemical plants, tank farms and coke ovens rather than for a catalogue. This page sets out how a rugged mobile phone supply route to Czech Republic will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. A rugged mobile phone for Czech Republic cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP65 to IP68 sealing | IP68 design |
| Drop and shock | A stated drop height onto concrete | Specification on request |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Czech Republic: Pardubice, Lovosice, Litvínov and Záluží | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Czech Republic. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Czech Republic market guide.
The Gazela pipeline connects Czech gas supply through Germany at Brandov or Rozvadov and through Slovakia at Lanžhot, so compressor and metering stations sit near the borders.
In 2022 electricity production was 78.8 TWh, of which 53.6% came from fossil fuels, mostly lignite, and 40.95% from nuclear, so coal-handling plants and power stations are typical dust and gas sites.
ATEX equipment is split into Group I for mining and Group II for surface industries, which matters in a country with coal mining as well as refining and chemicals.
Gas use was 9.4 billion cubic metres in 2021 and 7.1 billion in 2023, so gas distribution and industrial gas burners remain widespread across Czech industry.
A rugged phone is built to survive water, dust, drops and rough handling, usually rated by an IP code and a drop specification. Ruggedness is an environmental property: it says nothing about whether a phone may be used where flammable gas or dust is present. That is decided by explosion-protection certification and marking.
The IS-04Z1 combines both: an IP68 sealed rugged build and a design for Zone 1 and Zone 21 (marking target Ex ib IIC T4). The explosion-protection certificates are in progress and none has been issued.
In Czech Republic. Czech plants face cold winter rounds on tank farms and the wash-down regime of chemical plants. IP68 sealing and a rugged build, including low temperature and humidity, are designed for that. The certified ambient range is stated on the datasheet once the certificate fixes it. IP68 is not explosion protection, which comes from the ATEX certificate.
Supply of the IS-04Z1 to Czech Republic starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
It is designed to IP68 sealing, with glove-friendly controls. Ruggedness is not explosion protection: that depends on the certificates, which are in progress.
The market guide for Czech Republic covers Litvínov and Záluží, Kralupy nad Vltavou, Neratovice, Valašské Meziříčí, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Yes. ATEX separates Group I equipment for mining from Group II for surface industries, and methane and coal dust conditions underground differ from refinery gas and vapour. Check the Group marking on any device against the area and the mine operator's own approval process.
Crude arrives by pipeline from Germany and Italy, with storage at depots such as Nelahozeves, so many classified areas are at pumping and storage sites rather than ports. Terminal operators run their own induction and device registration, so schedule approvals early for shutdown work.
Czech law expects the instructions in Czech, so the manual, safe-use guidance and declaration of conformity are planned in Czech alongside English, with a Czech interface on Android 16. That is planned into the launch rather than translated afterwards. Certification is in progress. Check requirements with your safety officer.
More on Czech Republic, and on other places in Czech Republic.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.