Scale
The plants have about 18 crude stabilisation units and stabilise roughly half of Saudi Arabia's daily oil production, according to Aramco.
Abqaiq is a town in Saudi Arabia's Eastern Province, about 60 km south-west of the Dhahran-Dammam-Khobar area. It hosts Aramco's Abqaiq Plants, described by Aramco as the world's largest crude stabilisation plant, which removes hydrogen sulphide from crude, creating Zone 1 areas. Distribution partners for Abqaiq are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Abqaiq has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP65 to IP68 sealing | IP68 design |
| Drop and shock | A stated drop height onto concrete | Specification on request |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Abqaiq: Utilities units, Hydrogen sulphide removal, Crude stabilisation units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Abqaiq. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
The plants have about 18 crude stabilisation units and stabilise roughly half of Saudi Arabia's daily oil production, according to Aramco.
Desert conditions on the edge of the Empty Quarter, with high summer temperatures and dust.
Abqaiq's growth followed the discovery of the Abqaiq oil field in 1940, which is why the town grew up around Aramco operations and housing.
The processing complex covers about 250 hectares, so inspection and maintenance rounds involve long distances between units on a single fenced site.
Commercial air travel uses King Fahd International Airport in Dammam, about 90 km from Abqaiq, which sets the practical transit time for visiting engineers.
The Abqaiq to Yanbu natural gas liquids pipeline is described as Saudi Arabia's largest NGL line, carrying product west to Red Sea petrochemical plants.
A rugged phone is built to survive water, dust, drops and rough handling, usually rated by an IP code and a drop specification. Ruggedness is an environmental property: it says nothing about whether a phone may be used where flammable gas or dust is present. That is decided by explosion-protection certification and marking.
The IS-04Z1 combines both: an IP68 sealed rugged build and a design for Zone 1 and Zone 21 (marking target Ex ib IIC T4). The explosion-protection certificates are in progress and none has been issued.
In Abqaiq. Desert conditions on the edge of the Empty Quarter bring high summer temperatures and dust. IP68 on the IS-04Z1 addresses dust ingress and water, which is useful for outdoor work. It is not explosion protection: ignition safety rests on the Ex marking, and heat limits should be checked on the datasheet.
A distributor for Abqaiq would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
It is designed to IP68 sealing, with glove-friendly controls. Ruggedness is not explosion protection: that depends on the certificates, which are in progress.
Likely candidates are crude stabilisation units, natural gas liquids facility, utilities units, hydrogen sulphide removal. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Abqaiq.
King Fahd International Airport at Dammam is about 90 km away. Abqaiq's own airstrip is run by Saudi Aramco and is not open to commercial traffic, so visiting service teams normally fly to Dammam and continue by road under the host's transport rules.
Radio equipment supplied in Saudi Arabia is normally covered by Communications, Space and Technology Commission type approval, with certificates renewed periodically. Aramco sites may add their own device rules, so confirm both the national and the site requirement with your client.
Telecoms equipment conformity in Saudi Arabia has been handled through the SABER platform of SASO since February 2025, and the Communications, Space and Technology Commission is the telecoms regulator. These are separate from Ex certification. Ask the supplier for both, and check scope with the relevant authority.
Other guides for Abqaiq, other places in Saudi Arabia, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.