Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Spain · intrinsically safe

Intrinsically Safe Smartphone Supplier in Spain

The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for the refineries, chemical parks and LNG terminals from Bilbao to the Campo de Gibraltar. This page sets out how an intrinsically safe smartphone supply route to Spain will work for the IS-04Z1, and what is and is not available before launch.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Spain, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicintrinsically safe
DeviceSmartphone
RouteSupply
WhereSpain

Short answer. An intrinsically safe smartphone for Spain cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.

For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.

At a glance · intrinsically safe

Checklist: intrinsically safe smartphone for Spain

What to check, and where the IS-04Z1 stands today
CheckWhat to look forIS-04Z1 today
Level of protectionia, ib or ic matched to the zoneib, for Zone 1
Entity parametersUo, Io and Po within the device limitsPublished with the certificate
AccessoriesChargers and cases certified with the deviceDefined at certification
Where it appliesSpain: Puertollano, Muskiz and Bilbao, TarragonaClassified by the site operator
Product · Spain

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Spain. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The market · Spain

Where this applies in Spain

The classified areas, operators and sites below are the ones covered in the SAMS Spain market guide.

Operators, EPCs and contractors

Repsol
Industrial complexes at Cartagena, Tarragona, Puertollano, A Coruña and Bilbao.
Petronor
Repsol refinery at Muskiz on the Bilbao estuary.
Moeve
La Rábida at Huelva and San Roque in the Campo de Gibraltar.
BP
Coking refinery at Castellón on the Mediterranean coast.
Enagás
Owns the Barcelona, Cartagena and Huelva regasification plants.
Saggas and BBG
LNG terminals at Sagunto and in the Bilbao estuary.

Industrial areas and sites

Tarragona
Refinery plus the largest petrochemical cluster in southern Europe.
Cartagena and Escombreras
Refinery, chemical plants and an LNG terminal in one valley.
Huelva
The polo químico, La Rábida refinery and a regasification plant.
Campo de Gibraltar
San Roque refinery, Algeciras bay and heavy bunkering traffic.
Puertollano
Inland refinery and chemical complex in Castilla-La Mancha.
Muskiz and Bilbao
Petronor refinery, the estuary terminals and the BBG plant.
Field notes · Spain

More about Spain that matters for portable equipment

Spain: background

REPESA was incorporated in 1948 to build a refinery in the Escombreras valley at Cartagena, so Cartagena is among Spain's oldest refining and chemical locations.

Spain: industry on the ground

In 2020 Spain's primary energy came from petroleum (42.3%), natural gas (19.8%), coal (11.6%), nuclear (12%) and renewables (14.3%), so refining, gas and power sites all matter.

Spain: projects and investment

Renewables supplied 46.7% of power consumption in 2021 and Spain was the first country to rely on wind as its top energy source for a full year, so wind and solar construction is a large workload.

Spain: infrastructure

The Port of Tarragona has doubled its bulk-liquid storage area to 36 hectares, holds over 900,000 cubic metres of storage and serves chemical plants through a common pipeline rack, the Dixquimics Rack, with 71 lines.

The term · intrinsically safe

What “intrinsically safe” means for a smartphone

Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.

The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.

In Spain. Intrinsic safety suits the long walking routes within the complexes at Tarragona, Huelva and Cartagena and the rounds at regasification terminals. A handheld that limits ignition energy lets operators photograph, record and communicate in the area. The complexes are widely separated, so one configured handset per crew is practical.

The route · supply

Sourcing the IS-04Z1 for Spain

Nothing can be bought for Spain today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.

  1. 01

    Request the datasheet

    The technical specification, marking target and conditions of use, sent by email.

  2. 02

    Ask for the certification schedule

    Which certificates are in progress, in what order, and what is still to be confirmed.

  3. 03

    Evaluate in a safe area

    Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.

  4. 04

    Register for launch

    Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.

Questions · Spain

Frequently asked questions

Can we buy an intrinsically safe smartphone in Spain today?

Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.

What does an intrinsically safe smartphone in Spain cost?

SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.

What does ‘intrinsically safe’ mean for the IS-04Z1?

The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.

Which sites in Spain does this cover?

The market guide for Spain covers Tarragona, Cartagena and Escombreras, Huelva, Campo de Gibraltar, among others. Site-level pages are linked below.

How will SAMS supply Spain?

Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.

Where are Spain's main refining and chemical sites?

Cartagena's Escombreras valley is among the oldest refinery locations, and Repsol and other operators run refining and chemical sites on the coasts. Details change, so confirm the current site list and each operator's contractor requirements before planning work.

How do LNG and pipeline gas sites affect device choice in Spain?

Gas entry points, regasification plants and compressor stations are likely Zone 1 or Zone 2 areas, so check the device's gas group and temperature class against the site's classification drawings. Operators typically also require device registration and induction, so allow time before a shutdown.

Will the IS-04Z1 handle Spanish summer heat at a coastal refinery?

It is designed with IP68 sealing and a rugged build for heat, salt and wash-down. The T4 target is judged against the ambient range on the certificate, which is in progress. Check that range against peak August temperatures at your plant before specifying.

Enquiry · Spain

Ask about the IS-04Z1 for Spain

Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.

Enquiry · Spain

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Spain?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.