ADNOC: projects and investment
A joint venture between ADNOC (60 per cent) and ADQ (40 per cent) was launched in 2020 to invest in chemicals projects in the planned Ruwais Derivatives Park.
ADNOC is the Abu Dhabi state-owned energy group, with subsidiaries across upstream, midstream and downstream activities including refining, gas processing and petrochemicals. Its website quotes oil production capacity of 4.85 million barrels a day, and its group companies run large onshore and offshore sites. If you are specifying an intrinsically safe smartphone for ADNOC, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for ADNOC: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | ADNOC: Refinery process units, NGL fractionation, Offshore production facilities | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in United Arab Emirates. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of its operations and the kinds of classified area that matter for portable equipment.
ADNOC's website links suppliers to the ADNOC Supplier Hub, which has a supplier registration service and an In-Country Value (ICV) programme section; the page content could not be read in full, so confirm current requirements with the relevant group company. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
A joint venture between ADNOC (60 per cent) and ADQ (40 per cent) was launched in 2020 to invest in chemicals projects in the planned Ruwais Derivatives Park.
ADNOC Gas Processing, established in 1975 as GASCO, runs the largest gas processing complex in Abu Dhabi, with 26 processing trains and over 3,000 kilometres of pipeline.
ADNOC LNG processes and loads liquefied gas at Das Island, with exports going mainly to East Asia and especially Japan, so jetties and island logistics are part of the operation.
ADNOC Refining operates the Ruwais and Abu Dhabi refineries, and a 10 billion dollar expansion of the Ruwais refinery completed in 2015 doubled its capacity.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In ADNOC. Rounds across onshore and offshore fields, Das Island LNG processing and Ruwais refining involve large sites and island or offshore transport. A handheld designed for intrinsic safety could capture readings, photos and calls in classified spots if its certificate permits. Permit regimes belong to the relevant ADNOC group company.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
ADNOC's website links suppliers to the ADNOC Supplier Hub, which has a supplier registration service and an In-Country Value (ICV) programme section; the page content could not be read in full, so confirm current requirements with the relevant group company.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
ADNOC has 16 subsidiary companies, such as the drilling, gas and refining businesses, and each may apply its own supplier process, site rules and approvals alongside any group requirements. Confirm the current registration route and any company-specific equipment requirements with the relevant procurement and HSE teams.
No. Ruwais hosts ADNOC refining, Borouge's polyolefin plants and other companies, each running its own units and access rules inside the industrial complex. Confirm which company controls the unit you will enter, because induction, permits and equipment approvals are set by that operator.
Only if the final certificate, gas group and temperature class suit the area and the operating company permits it. The IS-04Z1 is designed for intrinsically safe handheld use with IP68 protection, but no certificate has been issued. Island and offshore logistics and charging need planning too.
More on ADNOC, and on other places in United Arab Emirates.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Name the site and the operator and we will send what is available before launch.