Industrial concentration
The northern part of the island is an industrial area, with oil storage in the south and a gas pipeline link to Saudi Arabia.
Sitra is an island on the east side of Bahrain Island whose northern part is an industrial area. The Bahrain Extrusion Company has operated an aluminium extrusion plant in the Sitra industrial zone since March 1977, so metal-working sits alongside oil facilities. Distribution partners for Sitra, Bahrain are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Sitra, Bahrain has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Sitra, Bahrain: Gas pipeline terminus, Refinery process units, Crude and product storage | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Sitra. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The northern part of the island is an industrial area, with oil storage in the south and a gas pipeline link to Saudi Arabia.
The site is coastal, hot and humid, so corrosion and dust are routine concerns for portable electronics.
East Sitra City, a reclamation project off the eastern coast, increased the island's size by about 50 percent and hosts new residential development.
Construction work on an upgrade of Bapco's Sitra refinery started in March 2019, including a new resid hydrocracking unit planned to be operational by 2023.
Sitra handles Bahrain's whole petroleum output and hosts the Port of Sitra.
The first oil infrastructure on Sitra was built in 1934 by Bapco, including a draw bridge connecting the island to Bahrain Island.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Sitra, Bahrain. Turnaround and commissioning work at a refinery means many people walking process units, tank farms and the gas pipeline terminus with phones for photos, permits and checklists. An intrinsically safe handheld avoids carrying an ordinary phone into classified areas. The IS-04Z1 is designed for that role once certified.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Sitra, Bahrain. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
Likely candidates are refinery process units, crude and product storage, hydrogen and hydrocracking units, sulphur recovery units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Sitra, Bahrain.
Aluminium extrusion and metal-working can produce metal dust in some processes, so some areas may have dust classification; the refinery is mostly gas and vapour. Ask the operator for its dust zone survey.
A bridge built in the 1930s links the island to Bahrain Island, and Manama is about 5 km away. Contractors normally go through each operator's gate with induction and permits.
Usually only if the operator's permit-to-work and equipment rules allow it, and for classified areas only if the device carries a suitable Ex marking. Refinery contractors generally follow the operator's registration systems. Confirm current requirements with the site operator before mobilising any fleet.
Other guides for Sitra, other places in Bahrain, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.