Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Sitra · IECEx

IECEx Mobile Phone in Sitra

In 2018 Bapco commissioned a new pipeline to replace pipeline infrastructure more than 70 years old between Bahrain and Saudi Arabia. It hosts the Bapco Sitra refinery, whose $7 billion modernisation was inaugurated in December 2024, and the GARMCO aluminium rolling mill, so refinery and heavy-industry hazardous areas are present. If you are specifying an IECEx mobile phone for Sitra, Bahrain, this page covers the markings, the approvals and the current certification status of the IS-04Z1.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Sitra, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicIECEx
DeviceMobile Phone
RouteSpecification
WhereSitra

Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Sitra, Bahrain: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.

Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.

At a glance · IECEx

Checklist: IECEx mobile phone for Sitra, Bahrain

Specification checklist against the IS-04Z1 today
CheckWhat to look forIS-04Z1 today
Certificate of conformityNumber checkable on the IECEx online registerIn progress; not issued
Standards editionThe IEC 60079 edition the certificate citesStated on the certificate when issued
Schedule of conditionsLimits of use, batteries and accessoriesPublished with the certificate
Where it appliesSitra, Bahrain: Gas pipeline terminus, Refinery process units, Crude and product storageClassified by the site operator
Product · Sitra

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Sitra. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The site · Sitra, Bahrain

Working in Sitra, Bahrain: operators and classified areas

The companies on site and the hazardous-area types a handset is likely to meet there.

Operators and companies on site

  • Bapco Energies (Sitra refinery)
  • Gulf Aluminium Rolling Mill Company (GARMCO)

Classified areas to expect

  • Gas pipeline terminus
  • Refinery process units
  • Crude and product storage
  • Hydrogen and hydrocracking units
Local conditions · Sitra, Bahrain

Conditions in Sitra, Bahrain that affect handheld equipment

Coastal climate

The site is coastal, hot and humid, so corrosion and dust are routine concerns for portable electronics.

Refinery modernisation

The modernised refinery is ramping up towards about 405,000 barrels a day, and contractors were still completing final units into late 2025 and early 2026.

Field notes · Sitra, Bahrain

More about Sitra, Bahrain that matters for portable equipment

Sitra, Bahrain: projects and investment

Construction work on an upgrade of Bapco's Sitra refinery started in March 2019, including a new resid hydrocracking unit planned to be operational by 2023.

Sitra, Bahrain: logistics and access

Sitra handles Bahrain's whole petroleum output and hosts the Port of Sitra.

Sitra, Bahrain: background

The first oil infrastructure on Sitra was built in 1934 by Bapco, including a draw bridge connecting the island to Bahrain Island.

Sitra, Bahrain: infrastructure

Bapco oil storage reservoirs are in the south of the island, and Sitra is the terminus of a 42 km pipeline linking it to Dhahran in Saudi Arabia.

The term · IECEx

What “IECEx” means for a smartphone

IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.

The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.

In Sitra, Bahrain. With the Sitra refinery ramping up towards about 405,000 barrels a day and contractors from abroad on site, an IECEx certificate of conformity with its schedule of conditions is the kind of document international teams already know. The IS-04Z1 aims for IECEx certification, which is still in progress and not yet held.

The route · specification

Specifying an IECEx mobile phone for Sitra

A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.

Check on the paper

Marking
Equipment group, category, protection concept, gas group and temperature class, matched to the area drawing.
Certificate and schedule
A certificate number, issuing body and the schedule of conditions, not a brochure claim.
Standards edition
The IEC 60079 or national standard edition the certificate was issued against.

Check for the IS-04Z1

Marking target
II 2 G Ex ib IIC T4: a target, not yet a certificate.
Certificate status
IECEx, ATEX, UKEX and NEC 500 in progress; none issued.
Operator approval
Separate from the certificate and handled with the site operator.
Questions · Sitra

Frequently asked questions

Can we buy an IECEx mobile phone in Sitra today?

Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.

What does an IECEx mobile phone in Sitra cost?

No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.

Does the IS-04Z1 hold an IECEx certificate?

No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.

Which areas at Sitra, Bahrain would use it?

Likely candidates are refinery process units, crude and product storage, hydrogen and hydrocracking units, sulphur recovery units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.

Is intrinsically safe the same as explosion proof?

Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.

Is the refinery still being modernised?

Construction of a refinery upgrade began in March 2019 and included a new resid hydrocracking unit planned for operation by 2023. Confirm the current project and commissioning status with Bapco.

Which hazardous areas are on Sitra?

Mainly the Bapco refinery and storage reservoirs, with process units, tank farms and loading facilities, plus the port. The extrusion and other light industry may have limited zones. Ask each operator for its classification drawing.

Does hydrogen service change what I should look for?

It can, because hydrogen units sit in the most demanding gas group, so the marking must cover that group. Sitra has hydrogen and hydrocracking units. Ask the operator for the classification of each unit and compare it with the device label rather than assuming one marking fits the whole refinery.

Enquiry · Sitra, Bahrain

Ask about the IS-04Z1 for Sitra, Bahrain, Bahrain

Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.

Enquiry · Sitra, Bahrain

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Sitra?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.