Mossmorran
Shell's Fife NGL plant separates natural gas liquids. ExxonMobil's Fife Ethylene Plant ceased production in February 2026 and is due to be decommissioned, so activity there is shifting to closure work.
Scotland has a long oil, gas and petrochemical base. The North Sea Transition Authority regulates licensing, and OPRED regulates environmental and decommissioning activity for offshore oil and gas, so offshore work answers to UK regulators rather than Scottish bodies. Distribution partners for Scotland are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Scotland has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Scotland: Gas terminals, Fuel import and storage terminal, Petrochemical process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Scotland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Shell's Fife NGL plant separates natural gas liquids. ExxonMobil's Fife Ethylene Plant ceased production in February 2026 and is due to be decommissioned, so activity there is shifting to closure work.
The terminal handles roughly a quarter of Britain's gas and sends natural gas liquids to Mossmorran. It is owned by North Sea Midstream Partners, with Shell, Esso and others as tenants.
Grangemouth Refinery on the Firth of Forth began operating in 1924 and was the only crude oil refinery in Scotland, but it has now closed; its neighbouring petrochemical complex dates from 1951.
Of about 25,000 jobs directly dependent on offshore oil and gas in 2019, 98% were in Aberdeen and Aberdeenshire, so equipment demand and contractor skills cluster in the north-east.
In 2022 oil and gas extraction contributed an estimated 25.2 billion pounds of gross value added, about 11.8% of Scottish GDP, which keeps offshore and terminal work a major source of hazardous-area activity.
Scottish waters hold the largest oil resources in Western Europe; oil was discovered in the North Sea in 1966 and the first year of full production was 1976.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Scotland. Rounds at the Grangemouth complex, Mossmorran's NGL plant and St Fergus cover process units, tanks and gas receipt areas. A handheld designed for intrinsic safety lets operators photograph and log conditions at the point of work. At sites in transition, such as Mossmorran, inspection during closure work follows the same logic.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Scotland yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
Likely candidates are petrochemical process units, natural gas liquids plant, gas terminals, fuel import and storage terminal. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Scotland.
Offshore and coastal sites face wind, rain, salt spray and cold, and winter weather can disrupt crew changes. For handheld devices check ingress protection, corrosion resistance, glove-friendly controls and low-temperature battery behaviour, and ask the platform or terminal for its own requirements.
Aberdeen and the north-east are the centre of offshore oil and gas support, with other activity at the Grangemouth industrial area on the Firth of Forth, east-coast and Shetland terminals, shipyards, distilleries and offshore wind bases. Zoning is site-specific, so ask each operator for classification drawings.
The Grangemouth refinery stopped processing crude in 2025 and is becoming a fuels import terminal, and ExxonMobil's Fife Ethylene Plant ceased production in February 2026 and is due to be decommissioned. Work may therefore shift towards closure and conversion, so ask operators which contractors and requirements apply.
More on Scotland, and on other places in United Kingdom.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.