Grangemouth
The refinery stopped processing crude in 2025 and is becoming a fuels import terminal, while the adjacent INEOS complex continues to run the UK's last operating ethylene cracker.
Scotland has a long oil, gas and petrochemical base. Hazardous-area work arises at the Grangemouth petrochemical complex on the Firth of Forth, the Mossmorran site in Fife and the St Fergus gas terminal in Aberdeenshire. Several of these sites are in transition. If you are specifying an industrial mobile phone for Scotland, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Scotland: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Scotland: Petrochemical process units, Natural gas liquids plant, Gas terminals | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Scotland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The refinery stopped processing crude in 2025 and is becoming a fuels import terminal, while the adjacent INEOS complex continues to run the UK's last operating ethylene cracker.
Shell's Fife NGL plant separates natural gas liquids. ExxonMobil's Fife Ethylene Plant ceased production in February 2026 and is due to be decommissioned, so activity there is shifting to closure work.
The North Sea Transition Authority regulates licensing, and OPRED regulates environmental and decommissioning activity for offshore oil and gas, so offshore work answers to UK regulators rather than Scottish bodies.
Grangemouth Refinery on the Firth of Forth began operating in 1924 and was the only crude oil refinery in Scotland, but it has now closed; its neighbouring petrochemical complex dates from 1951.
Of about 25,000 jobs directly dependent on offshore oil and gas in 2019, 98% were in Aberdeen and Aberdeenshire, so equipment demand and contractor skills cluster in the north-east.
In 2022 oil and gas extraction contributed an estimated 25.2 billion pounds of gross value added, about 11.8% of Scottish GDP, which keeps offshore and terminal work a major source of hazardous-area activity.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Scotland. Scottish operators run large contractor workforces, and several sites are changing: Grangemouth's refinery has become a fuels terminal, and the Fife Ethylene Plant ceased production in February 2026. MDM or EMM enrolment must be flexible as contractors change. Charging should be in offices or control rooms outside classified areas.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are petrochemical process units, natural gas liquids plant, gas terminals, fuel import and storage terminal. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Offshore installations in the UK sector normally expect equipment certified for explosive atmospheres under UK rules, and CE-marked ATEX equipment has been widely accepted under transitional arrangements. Operators also add their own policies, so confirm the accepted marking and any site-specific approvals with the duty holder.
Decommissioning of ageing North Sea installations is forecast to grow as production declines, and it involves cleaning, cutting and removal of hydrocarbon systems in classified areas. Teams often need portable communications that are certified for the area, so confirm requirements with the operator or decommissioning contractor.
The Grangemouth petrochemical complex on the Firth of Forth, Mossmorran in Fife and the St Fergus gas terminal in Aberdeenshire. Several are in transition, so activity may be shifting. Confirm current requirements with the site operator before planning equipment.
Other guides for Scotland, other places in United Kingdom, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.