Malaysia: rules and approvals
Energy supply is regulated by the Energy Commission (Suruhanjaya Tenaga) and the Department of Electricity and Gas Supply, under laws that include the 1974 Petroleum Development Act and the 1993 Gas Supply Acts.
A Zone 1 and Zone 21 handset for Malaysian crews: process and maintenance technicians at Pengerang and Kertih, LNG operators at Bintulu, offshore production staff off Miri and Kimanis, and the safety and telecoms people who issue their equipment. Malaysia Petroleum Management, a division of Petronas, oversees the whole lifecycle of the country's upstream oil and gas assets, so site rules for field equipment are typically passed down through the operator. Distribution partners for Malaysia are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Malaysia has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Malaysia: Gebeng, Pahang, Bintulu, Sarawak, Miri, Sarawak | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Malaysia. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Malaysia market guide covers.
Energy supply is regulated by the Energy Commission (Suruhanjaya Tenaga) and the Department of Electricity and Gas Supply, under laws that include the 1974 Petroleum Development Act and the 1993 Gas Supply Acts.
PETRONAS describes its Pengerang Integrated Complex in Johor as one of Southeast Asia's largest integrated petrochemical facilities, valued at USD 27 billion and located within the Pengerang Integrated Petroleum Complex.
Petronas is a vertically integrated group covering exploration, refining, distribution, power generation and trading, with subsidiaries such as Petronas Carigali for upstream, Petronas Chemicals for petrochemicals and Petronas Dagangan for marketing.
Oil exploration in Sarawak started at Miri, where Shell drilled the first well in 1910; the well became known as the Grand Old Lady, which gives the north-west of Borneo a long upstream history.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Malaysia. Technicians at Kertih, Pengerang and Bintulu make long outdoor rounds and turnaround inspections, and offshore crews spend a hitch on platforms reached by helicopter or boat. An intrinsically safe handheld lets one device carry the camera, GNSS and work-order app into classified ground, and nothing can be replaced mid-hitch if it is not practical to carry spares.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Malaysia yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
The market guide for Malaysia covers Pengerang, Johor, Kertih, Terengganu, Gebeng, Pahang, Bintulu, Sarawak, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Malaysia.
Normally the plant operator decides, through its HSE and instrumentation teams, usually by asking for ATEX or IECEx documentation against IEC 60079. Mobile radio approval is a separate matter handled under MCMC rules. Confirm both with the operator and your importer before ordering.
Sarawak's Miri area has the oldest upstream history, and Petronas Carigali runs the country's main exploration and production business. Gas processing and LNG are central to energy planning. Exact field and plant lists change, so confirm current sites with your client.
It is designed for Zone 1 with IP68 sealing and a 4,000 mAh battery, but offshore use depends on the platform's own classification and the certificate's ambient range. Crews cannot replace kit mid-hitch, so confirm battery plans, charging in safe areas and approval with the platform operator.
More on Malaysia, and on other places in Malaysia.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.