Bapco: projects and investment
Bapco Refining manages what Bapco Energies calls the largest energy investment in Bahrain, so contractor and commissioning activity is heavy around the refinery.
The Bahrain Petroleum Company was founded in 1929, discovered oil in 1932 and built Bahrain's first refinery in 1936. Reports say the expansion includes a 65,000 barrel a day LC-Fining residue hydrocracking unit, new 225,000 barrel a day crude distillation units and sulphur recovery systems, with commissioning targeted for late 2025. Buyers searching for an intrinsically safe mobile phone supplier for Bapco can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An intrinsically safe mobile phone for Bapco cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Bapco: Gas handling, Onshore oil production, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Bahrain. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
Bapco Energies' website carries a Vendors & Suppliers page under its Our Responsibility section; confirm current registration steps with its procurement team. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
Bapco Refining manages what Bapco Energies calls the largest energy investment in Bahrain, so contractor and commissioning activity is heavy around the refinery.
Bapco Energies, formerly nogaholding, was set up in 2007 and became an independent agency when the National Oil and Gas Authority was abolished in September 2021, so it now acts as the Bahrain energy group's parent.
Bahrain's LNG import terminal at Al Hidd, opened in May 2019, has a floating storage unit, jetty, regasification platform, onshore gas storage and nitrogen plant, and a capacity of about 800 million cubic feet a day.
The modernisation programme will replace some of the oldest and least efficient refinery units and also needs changes at the Sitra tank farm, Sitra wharf and the transfer pipelines.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Bapco. Rounds across the Sitra refinery, gas treatment plant and fuel loading areas involve reading gauges, photographing leaks and filing permits, often in classified areas. A handheld designed as intrinsically safe could handle those tasks on one device. The IS-04Z1 is designed for that, though certification is still in progress.
There is no stock to order for Bapco yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
Bapco Energies' website carries a Vendors & Suppliers page under its Our Responsibility section; confirm current registration steps with its procurement team.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Radio equipment in Bahrain is normally approved against EU-style conformity requirements, with approved products labelled and certificates valid for a limited time, currently three years. Confirm the current rules with the telecommunications authority or your local importer, then ask Bapco about site device policy.
Both may be involved. Bapco Refining owns and operates the refinery, while Bapco Energies provides central support such as HR, finance, risk and commercial services. The company's website carries a vendors and suppliers page, so confirm the current registration route with procurement.
Only if its marking matches the area classification, which the operator sets. Fuel loading areas often involve IIA or IIB, but the documents decide. The IS-04Z1 target is II 2 G Ex ib IIC T4, not yet certified. Confirm requirements with Bapco Energies' procurement and HSE teams.
More on Bapco, and on other places in Bahrain.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.