Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Singapore LNG · intrinsically safe

Intrinsically Safe Mobile Phone in Singapore LNG

The SLNG Terminal sits on a 40-hectare plot at the southern-most tip of Jurong Island and began commercial operations in May 2013. It receives, stores and sends out natural gas, mainly for power generation, so tank, jetty and send-out areas are gas-hazardous. If you are specifying an intrinsically safe mobile phone for Singapore LNG Terminal, Jurong Island, this page covers the markings, the approvals and the current certification status of the IS-04Z1.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Singapore LNG, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicintrinsically safe
DeviceMobile Phone
RouteSpecification
WhereSingapore LNG

Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Singapore LNG Terminal, Jurong Island: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.

Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.

At a glance · intrinsically safe

Checklist: intrinsically safe mobile phone for Singapore LNG Terminal, Jurong Island

Checks a reviewer should make, with the IS-04Z1 position
CheckWhat to look forIS-04Z1 today
Level of protectionia, ib or ic matched to the zoneib, for Zone 1
Entity parametersUo, Io and Po within the device limitsPublished with the certificate
AccessoriesChargers and cases certified with the deviceDefined at certification
Where it appliesSingapore LNG Terminal, Jurong Island: LNG storage tanks, LNG jetties and loading arms, Regasification and send-outClassified by the site operator
Product · Singapore LNG

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Singapore LNG. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The site · Singapore LNG Terminal, Jurong Island

Singapore LNG Terminal, Jurong Island at a glance: who is there, what is classified

A short profile of the site and the kinds of classified area that matter for portable equipment.

Operators and companies on site

  • Singapore LNG Corporation (SLNG)

Classified areas to expect

  • LNG storage tanks
  • LNG jetties and loading arms
  • Regasification and send-out
Local conditions · Singapore LNG Terminal, Jurong Island

Site conditions at Singapore LNG Terminal, Jurong Island: what wears and what limits equipment

Storage and capacity

SLNG states three tanks of 180,000 cubic metres each plus a fourth of 260,000 cubic metres, with average send-out capacity of 9 million tonnes per annum and a peak of around 11.

Jetties

Two jetties accommodate LNG vessels from 2,000 to 265,000 cubic metres, up to the largest Q-Max carriers.

Field notes · Singapore LNG Terminal, Jurong Island

More about Singapore LNG Terminal, Jurong Island that matters for portable equipment

Singapore LNG Terminal, Jurong Island: infrastructure

The SLNG Terminal has an annualised average gas supply capacity of 9 million tonnes per annum and a peak capacity of up to 11 million tonnes per annum.

Singapore LNG Terminal, Jurong Island: infrastructure

It has two jetties and four storage tanks: three of 180,000 cubic metres and a fourth of 260,000 cubic metres, one of the largest LNG tanks in the world.

Singapore LNG Terminal, Jurong Island: industry on the ground

Natural gas now generates over 90 percent of Singapore's electricity, compared with under 20 percent in 2000, so continuity of send-out is treated as a national energy-security matter.

Singapore LNG Terminal, Jurong Island: projects and investment

SLNG began building a new LNG truck loading facility in August 2025, adding road-tanker loading to the terminal, and describes itself as the owner of Asia's first open-access, multi-user LNG terminal.

The term · intrinsically safe

What “intrinsically safe” means for a smartphone

Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.

The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.

In Singapore LNG Terminal, Jurong Island. Rounds at an LNG terminal cover storage tanks, jetties and loading arms, and regasification and send-out equipment. A handheld intrinsically safe phone is intended for readings, photographs and permit steps in those zones. It remains subject to certification, which is in progress, and to SLNG's own rules.

The route · specification

Specifying an intrinsically safe mobile phone for Singapore LNG

A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.

Check on the paper

Marking
Equipment group, category, protection concept, gas group and temperature class, matched to the area drawing.
Certificate and schedule
A certificate number, issuing body and the schedule of conditions, not a brochure claim.
Standards edition
The IEC 60079 or national standard edition the certificate was issued against.

Check for the IS-04Z1

Marking target
II 2 G Ex ib IIC T4: a target, not yet a certificate.
Certificate status
IECEx, ATEX, UKEX and NEC 500 in progress; none issued.
Operator approval
Separate from the certificate and handled with the site operator.
Questions · Singapore LNG

Frequently asked questions

Can we buy an intrinsically safe mobile phone in Singapore LNG today?

Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.

What does an intrinsically safe mobile phone in Singapore LNG cost?

There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.

What does ‘intrinsically safe’ mean for the IS-04Z1?

The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.

Which areas at Singapore LNG Terminal, Jurong Island would use it?

Likely candidates are lng storage tanks, lng jetties and loading arms, regasification and send-out. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.

Is intrinsically safe the same as explosion proof?

Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.

What hazardous areas does an LNG terminal have?

Typical classified areas include jetty loading arms and manifolds, tank roofs and vent systems, pump and vaporiser areas and send-out metering. Natural gas is typically treated as gas Group IIA, but check the gas group and temperature class against the terminal's own classification.

Will new terminal projects create work for field equipment?

SLNG plans a second offshore terminal by the end of the decade and has expanded the current one in stages. Construction and commissioning phases bring many contractors on site, so approved-equipment lists and induction rules apply from day one; confirm them with the project team.

Which areas of the terminal are classified?

The tank, jetty and send-out areas create Zone 1 and Zone 2 conditions according to the site description, and small-scale reloading is also a gas area. SLNG classifies them. Ask it for the classification drawings and do not assume zones from the general description.

Enquiry · Singapore LNG Terminal, Jurong Island

Ask about the IS-04Z1 for Singapore LNG Terminal, Jurong Island, Singapore

Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.

Enquiry · Singapore LNG Terminal, Jurong Island

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Singapore LNG?

Send the zone and gas group of your site and we will reply with the datasheet and schedule.