Role
The terminal supplies about half of Singapore's natural gas for power generation, the remainder coming by pipeline.
Gas and LNG facilities are covered by Singapore's Workplace Safety and Health framework, and Major Hazard Installations need documented area classification drawings under MOM and SCDF rules. It receives, stores and sends out natural gas, mainly for power generation, so tank, jetty and send-out areas are gas-hazardous. This page explains what to look for in an IECEx mobile phone for Singapore LNG Terminal, Jurong Island, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Singapore LNG Terminal, Jurong Island: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Singapore LNG Terminal, Jurong Island: LNG storage tanks, LNG jetties and loading arms, Regasification and send-out | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Singapore LNG. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
The terminal supplies about half of Singapore's natural gas for power generation, the remainder coming by pipeline.
SLNG states three tanks of 180,000 cubic metres each plus a fourth of 260,000 cubic metres, with average send-out capacity of 9 million tonnes per annum and a peak of around 11.
It has two jetties and four storage tanks: three of 180,000 cubic metres and a fourth of 260,000 cubic metres, one of the largest LNG tanks in the world.
Natural gas now generates over 90 percent of Singapore's electricity, compared with under 20 percent in 2000, so continuity of send-out is treated as a national energy-security matter.
SLNG began building a new LNG truck loading facility in August 2025, adding road-tanker loading to the terminal, and describes itself as the owner of Asia's first open-access, multi-user LNG terminal.
When it opened in 2013 the terminal had a single jetty and two storage tanks, and it has been expanded in stages as Singapore's LNG demand grew.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Singapore LNG Terminal, Jurong Island. An LNG terminal receives carriers and contractors from many countries, which is where an international scheme helps. IECEx offers a certificate of conformity plus a schedule of conditions that a visiting inspector can read in the same way everywhere. For the IS-04Z1 both are pending, as the programme is in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are lng storage tanks, lng jetties and loading arms, regasification and send-out. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Typical classified areas include jetty loading arms and manifolds, tank roofs and vent systems, pump and vaporiser areas and send-out metering. Natural gas is typically treated as gas Group IIA, but check the gas group and temperature class against the terminal's own classification.
SLNG plans a second offshore terminal by the end of the decade and has expanded the current one in stages. Construction and commissioning phases bring many contractors on site, so approved-equipment lists and induction rules apply from day one; confirm them with the project team.
The tank, jetty and send-out areas create Zone 1 and Zone 2 conditions according to the site description, and small-scale reloading is also a gas area. SLNG classifies them. Ask it for the classification drawings and do not assume zones from the general description.
Related guides for Singapore LNG and for Singapore.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.