Refinery status
The old refinery reopened in November 2024 but was shut for maintenance in May 2025; check its current operating state before planning visits.
Port Harcourt is the main city of Rivers State and Nigeria's chief oil-refining city, with the Port Harcourt Refining Company complex at Eleme and seaports at Onne and the city wharf. Crude was first exported through the port in 1958, and many operators keep offices here. This page explains what to look for in an intrinsically safe mobile phone for Port Harcourt, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Port Harcourt: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Port Harcourt: Refinery process units, Flow stations and gas plants, Export and port facilities | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Port Harcourt. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
The old refinery reopened in November 2024 but was shut for maintenance in May 2025; check its current operating state before planning visits.
Many facilities are in low-lying creek and swamp areas reached by road or boat.
Onne, in Eleme, hosts the Onne Oil and Gas Free Zone, a main offshore support base where supply vessels call every week and where Shell and other operators lease berths and shore facilities.
The Port Harcourt Refining Company at Alesa Eleme runs two refineries, a 1965 plant of 60,000 barrels per stream day and a 1989 plant of 150,000, giving 210,000 barrels per stream day combined.
Shell-BP found oil at Oloibiri in 1956 and discovered the Afam and Bomu wells in Ogoni territory in the same period, so the region around Port Harcourt has among Nigeria's oldest producing areas.
Port Harcourt was founded in 1912 to export coal from Enugu, 243 km to the north, over the Eastern Line railway, so it was a port city long before oil.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Port Harcourt. Many facilities are in low-lying creek and swamp areas reached by road or boat, so crews cover long routes and cannot easily return to a safe area. A handheld that is intrinsically safe allows photos, permits and reports at the point of work. That is the purpose of the IS-04Z1 design, subject to certification.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
Likely candidates are refinery process units, flow stations and gas plants, export and port facilities, pipeline and pumping facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Equipment commonly arrives through the Lagos ports or airport and then moves by road or air, or through the Port Harcourt area port facilities, depending on the shipment. Allow time for clearance and security arrangements, and agree site access and device registration with the operator beforehand.
It is a base for the Niger Delta oil industry: the first shipment of Nigerian crude left through the port in 1958 and operators such as Shell, Chevron and Agip have offices there. Wellsites, flow stations and terminals are around the city, so confirm each site's rules.
Many facilities are in low-lying creek and swamp areas reached by road or boat. Plan transport with the operator or contractor, protect devices from rain and spray, and keep spare units charged in a safe area. Confirm access rules with the site operator.
Related guides for Port Harcourt and for Nigeria.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.