United Arab Emirates: geography and layout
The total area is about 83,600 square kilometres, and south and west of Abu Dhabi vast sand dunes merge into the Rub al Khali.
The IS-04Z1 is a Zone 1 and Zone 21 handset for UAE field crews and the people who equip them: offshore operators, maintenance technicians, HSE advisers and telecoms teams. Jebel Ali, about 35 km south-west of Dubai, has the largest man-made harbour in the world, and JAFZA hosts over 8,700 companies. Distribution partners for United Arab Emirates are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. United Arab Emirates has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | United Arab Emirates: Das Island, Zirku Island, Upper Zakum | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in United Arab Emirates. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Operators and classified areas drawn from the SAMS United Arab Emirates market guide.
The total area is about 83,600 square kilometres, and south and west of Abu Dhabi vast sand dunes merge into the Rub al Khali.
The Ministry of Industry and Advanced Technology handles conformity declarations for safety, valid for one year, with a local representative required.
Jebel Ali also hosts a large power and desalination complex and an aluminium smelter alongside oil storage and bunkering terminals.
The UAE stretches more than 650 km along the southern shore of the Persian Gulf, and most of the coast consists of salt pans that extend far inland.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In United Arab Emirates. Intrinsic safety suits long rotations at offshore and island sites such as Das, Zirku and Upper Zakum, where a spare is a helicopter away. A handheld that limits ignition energy lets crews take photographs, record position and communicate in the zone, collapsing radio, camera and torch into one signed-out device.
A distributor for United Arab Emirates would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
The market guide for United Arab Emirates covers Ruwais, Habshan, Das Island, Zirku Island, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for United Arab Emirates.
The Ministry of Industry and Advanced Technology handles safety declarations of conformity, listed as valid for one year with a local representative required. This is separate from the TDRA telecom approval, so ask your supplier to confirm both.
Ruwais and the Abu Dhabi oil and gas fields, Fujairah's oil terminals, Jebel Ali in Dubai, with its power, desalination and aluminium smelter complex. Each belongs to a different operator.
It is designed with a 4,000 mAh battery and a fully sealed body to stay in service until the next rotation, since there is no same-day replacement. Certification is in progress. Confirm area classification and permit rules with the operator before any use.
Other guides for United Arab Emirates, other places in United Arab Emirates, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.