Deep-water port
The port has deep-water jetties able to handle very large vessels, including Valemax ore carriers.
Sohar is the capital of Al Batinah North Governorate and hosts SOHAR Port and Freezone, a deep-sea industrial port on the Gulf of Oman. The first lease at the new port was signed with Sohar Refinery in 2003, and the free zone itself was established in 2010, so many plants are of 2000s to 2010s vintage. An industrial smartphone distributor in Sohar would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Sohar has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Sohar: Fuel and chemical storage, Industrial plant utilities, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Sohar. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The port has deep-water jetties able to handle very large vessels, including Valemax ore carriers.
The Sohar Aluminium smelter has a capacity of roughly 390,000 tonnes a year with its own power plant, so construction and maintenance contractors are present.
Government development plans for Sohar include more than 5 billion US dollars of investment in the steel industry, which adds heavy-industry maintenance work to the port's chemical and fuel sites.
SOHAR Port is described as handling more than one million tonnes of sea cargo a week and around 3,500 ship calls a year, so jetty and yard traffic is continuous.
Hafeet Rail is building a 238 km line to connect the port with the UAE national network, and its first track shipment arrived through the Steinweg general cargo terminal.
C. Steinweg Oman holds the concession for dry bulk, break-bulk, roll-on/roll-off and container stuffing operations in the port, so cargo-side contractors work under a separate terminal operator.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Sohar. The Sohar Aluminium smelter started in 2008, so construction and maintenance contractors are present alongside operator staff. EMM and MDM support lets an administrator enrol and retire devices as contractor crews change. Charge in safe areas, and expect each operator to run its own supplier approval and permit system.
A distributor for Sohar would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are refinery process units, port liquid bulk handling, fuel and chemical storage, industrial plant utilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Sohar.
Radio equipment sold or used in Oman normally needs Telecommunications Regulatory Authority type approval or a declaration of conformity route, with a TRA label. Requirements change, so check the authority's current rules or ask your local importer before shipment.
Typically the tenant or terminal operator, not the port authority alone. Dry-bulk and general cargo areas run under a terminal concession, while refinery and chemical tenants have their own HSE rules. Confirm the approval route with the site operator before shipping any device.
Summers are extremely hot, with a record of 50.8 C, and rainfall is low. Check the certified ambient range, keep devices out of direct sun and charge only in a safe area. IP68 helps with dust but is not explosion protection.
Other guides for Sohar, other places in Oman, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Name the site and the operator and we will send what is available before launch.