Yards
Seatrium offers construction, repair, upgrading and conversion of rigs, floaters and offshore platforms from its Singapore yards.
Singapore supports offshore oil and gas through rig and floating-unit work at Seatrium yards and through the Loyang Offshore Supply Base run by Toll Offshore Petroleum Services. Keppel Shipyard secured an FPSO conversion contract worth 89 million dollars in 2015, covering repair, upgrade and modification, an example of the conversion work done in Singapore. An industrial mobile phone distributor in Singapore offshore support sector would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Singapore offshore support sector has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Singapore offshore support sector: Vessel mobilisation quays, Hazardous materials storage, Rig and floating-unit conversion | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Singapore Offshore Operations. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Seatrium offers construction, repair, upgrading and conversion of rigs, floaters and offshore platforms from its Singapore yards.
TOPS lists a 970-metre wharf, workshops and storage for hazardous materials at Loyang, with hot works and afloat repairs among its services.
Two of the world's largest FPSOs, P-80 and P-82, were christened at Seatrium's Tuas Boulevard Yard, each able to produce 225,000 barrels of oil a day, with an industry-first dual sailaway.
Seatrium was formed in 2023 when Sembcorp Marine took over Keppel Offshore & Marine and was renamed, and it runs shipyards in Singapore, Indonesia, the United Kingdom and Brazil.
Alongside the main Singapore yards, Seatrium operates offshore-specific yards at Crescent and Pandan, so rigs and floating units are fitted out at several locations.
The Loyang base covers 32 hectares and its wharf area can serve more than 11 vessels at once, with 24-hour manned security and video surveillance.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Singapore offshore support sector. Activity depends on the timing of rig and FPSO projects, so headcount swings between quiet periods and peaks. A managed fleet under EMM or MDM can be sized up and down, with enrolment before devices reach the yard. Charging stays in safe areas, and the project sets network and app rules.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Singapore offshore support sector yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are rig and floating-unit conversion, offshore equipment repair workshops, vessel mobilisation quays, hazardous materials storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Singapore offshore support sector.
Newbuild and conversion projects ramp up in phases, with contractor numbers peaking during outfitting and commissioning. Dates are set by owners and yards, so contact the project team early to learn the approved-equipment list and induction requirements.
The Loyang base describes 24-hour manned security, strict access requirements and video surveillance. Expect advance registration and gate screening, and declare any electronic equipment. Confirm details with the host company before travel.
Buyers here are typically yards, service companies and operators with their own approvals, and a project may follow the unit owner's rules as well. SAMS cannot grant approval. Ask each project's safety team for its device requirements, and confirm with the site operator.
Other guides for Singapore Offshore Operations, other places in Singapore, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.