Czech Republic: logistics and access
State operator MERO finished expanding the Transalpine pipeline at the end of 2024, delivering up to 8 million tonnes of oil a year, with the central oil depot at Nelahozeves as a key storage point.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for Czech refineries, chemical plants, tank farms and coke ovens rather than for a catalogue. This page sets out how an industrial cell phone supply route to Czech Republic will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An industrial cell phone for Czech Republic cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Czech Republic: Pardubice, Lovosice, Litvínov and Záluží | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Czech Republic. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Czech Republic market guide.
State operator MERO finished expanding the Transalpine pipeline at the end of 2024, delivering up to 8 million tonnes of oil a year, with the central oil depot at Nelahozeves as a key storage point.
The country has two refineries, both owned by Česká rafinérská, including the Litvínov refinery, so Litvínov and Kralupy are the best-known flammable-liquid processing sites.
The Orlen Unipetrol group includes refineries and plants at Litvínov and Kralupy nad Vltavou, Paramo at Pardubice and Kolín, Spolana at Neratovice, and two research centres, and it is the only crude oil processor in the country.
The Ingolstadt-Kralupy-Litvínov pipeline can bring crude oil from Germany and can be connected to the Transalpine pipeline, so crude arrives through pipeline terminals rather than seaports.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Czech Republic. Contractor crews arrive and leave during shutdowns, which can make handover a weekly event. Android 16 with EMM and MDM lets a device be enrolled, restricted to the applications a site allows, wiped and reissued. The interface is in Czech, and the instructions and declaration are produced in Czech, as Czech law expects.
There is no stock to order for Czech Republic yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
The market guide for Czech Republic covers Litvínov and Záluží, Kralupy nad Vltavou, Neratovice, Valašské Meziříčí, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
The Czech Republic is an EU member, so ATEX Directive 2014/34/EU applies to equipment and employers zone workplaces under Directive 1999/92/EC. Refineries such as Litvínov typically also have internal device approval and permit-to-work procedures, so ask the HSE office before bringing phones in.
Czech is the usual site language, and ATEX user instructions are typically expected in the local language of the destination. A Czech-language instruction sheet with the certificate pack often speeds up acceptance. Ask the operator whether it also accepts English documentation for contractors.
FTZÚ in Ostrava-Radvanice is notified body 1026, and Czech engineers recognise it on an Ex certificate, so buyers often ask which body issued one before anything else. The certificate number, issuing body and marking string will be published for checking. No certificate exists yet, as certification is in progress.
Other guides for Czech Republic, other places in Czech Republic, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.