Netherlands: logistics and access
The Nieuwe Waterweg links the Rhine and Meuse to the sea, and the Betuweroute freight railway to Germany opened its Dutch section in 2007, so material and equipment move by ship, barge, rail and road.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, aimed at the refineries, chemical parks and tank terminals between Rotterdam and Geleen. This page sets out how an IECEx smartphone supply route to Netherlands will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An IECEx smartphone for Netherlands cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Netherlands: Moerdijk, Geleen, Pernis | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Netherlands. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Netherlands market guide covers.
The Nieuwe Waterweg links the Rhine and Meuse to the sea, and the Betuweroute freight railway to Germany opened its Dutch section in 2007, so material and equipment move by ship, barge, rail and road.
Two coal-fired power stations at Eemshaven and Maasvlakte are scheduled to close by 2030, and Borssele is the only nuclear power station, producing about 3.3% of electricity used.
The Netherlands had 2,606 wind turbines in December 2020 and targets 70% renewable electricity by 2030, so wind and energy transition projects are a growing part of site work.
The petrochemical industry and general cargo transshipment are the most important activities in the port, and large oil refineries are located west of the city, making it one of Europe's densest hazardous-area clusters.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Netherlands. Rotterdam, Moerdijk and Terneuzen host international operators and visiting contractors, including Dow Benelux and Stork. IECEx gives them a global scheme alongside ATEX, which is the primary route in the Netherlands. Ask for the certificate of conformity with its schedule of conditions, since that records the marking, ambient range and any conditions of use.
Nothing can be bought for Netherlands today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Netherlands covers Pernis, Botlek, Europoort, Maasvlakte, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Dutch is the national language, but many Rotterdam terminals work in English because of their international customers. ATEX instructions are typically expected in the language of the destination, so confirm with the site safety office whether English or Dutch documents are required.
The Netherlands is an EU member, so ATEX Directive 2014/34/EU applies to equipment and Directive 1999/92/EC to zoning. Most Rotterdam terminals expect Zone 1 or Zone 2 devices to carry Ex and CE marking. Each concession adds its own registration and permit rules, so check before arrival.
The Warenwetbesluit requires a Dutch-language instruction manual for explosion-safe equipment, so buyers usually ask for it with the marking string. The ATEX programme for the IS-04Z1 is in progress, and documents are not yet issued. Confirm requirements with your site operator and the supplier before purchase.
Other guides for Netherlands, other places in Netherlands, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.