Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Malaysia · IECEx

IECEx Smartphone Supplier in Malaysia

A Zone 1 and Zone 21 handset for Malaysian crews: process and maintenance technicians at Pengerang and Kertih, LNG operators at Bintulu, offshore production staff off Miri and Kimanis, and the safety and telecoms people who issue their equipment. Buyers searching for an IECEx smartphone supplier for Malaysia can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Malaysia, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicIECEx
DeviceSmartphone
RouteSupply
WhereMalaysia

Short answer. An IECEx smartphone for Malaysia cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.

Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.

At a glance · IECEx

Checklist: IECEx smartphone for Malaysia

Specification checklist against the IS-04Z1 today
CheckWhat to look forIS-04Z1 today
Certificate of conformityNumber checkable on the IECEx online registerIn progress; not issued
Standards editionThe IEC 60079 edition the certificate citesStated on the certificate when issued
Schedule of conditionsLimits of use, batteries and accessoriesPublished with the certificate
Where it appliesMalaysia: Miri, Sarawak, Kemaman, Terengganu, Pengerang, JohorClassified by the site operator
Product · Malaysia

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Malaysia. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The market · Malaysia

Where an Ex phone is used in Malaysia

Operators and classified areas drawn from the SAMS Malaysia market guide.

Operators, EPCs and contractors

PETRONAS
Upstream, gas processing, refining and petrochemicals nationwide
Pengerang Refining and Petrochemical
Refinery and cracker complex at Pengerang, Johor
PETRONAS Chemicals Group
Olefins, derivatives and fertiliser at Kertih, Gebeng and Gurun
Malaysia LNG
The liquefaction complex and jetties at Bintulu, Sarawak
Sarawak Shell and Sabah Shell
Offshore oil and gas operations and their onshore support
Dialog Group
Pengerang deepwater terminals and plant maintenance services

Industrial areas and sites

Pengerang, Johor
Refinery, cracker and the deepwater storage terminals
Kertih, Terengganu
Gas processing plants and an integrated petrochemical complex
Gebeng, Pahang
Chemical plants beside Kuantan Port
Bintulu, Sarawak
LNG trains, jetties and the Samalaju heavy industry park
Miri, Sarawak
Onshore terminals, the crude oil terminal and offshore support
Kemaman, Terengganu
Supply base, fabrication yards and the oil terminal
Field notes · Malaysia

More about Malaysia that matters for portable equipment

Malaysia: rules and approvals

The Malaysian Communications and Multimedia Commission (MCMC), based in Cyberjaya, regulates communications under the Communications and Multimedia Act 1998, so radio and mobile-device rules sit with a different body from Ex rules.

Malaysia: industry on the ground

Electrical and electronic products, petroleum products, LNG, chemicals and palm-oil-based manufactures are among the main exports, so processing sites range from petrochemical units to palm-oil mills.

Malaysia: rules and approvals

Energy supply is regulated by the Energy Commission (Suruhanjaya Tenaga) and the Department of Electricity and Gas Supply, under laws that include the 1974 Petroleum Development Act and the 1993 Gas Supply Acts.

Malaysia: projects and investment

PETRONAS describes its Pengerang Integrated Complex in Johor as one of Southeast Asia's largest integrated petrochemical facilities, valued at USD 27 billion and located within the Pengerang Integrated Petroleum Complex.

The term · IECEx

What “IECEx” means for a smartphone

IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.

The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.

In Malaysia. Malaysia hosts international operators such as the Shell companies, large EPC and fabrication firms including MMHE and Sapura Energy, and contractors who rotate between sites. IECEx gives them one scheme to cite. Ask for the certificate of conformity and its schedule of conditions, which fix the marking and use limits. SIRIM and MCMC steps for the radio run separately.

The route · supply

Sourcing the IS-04Z1 for Malaysia

Supply of the IS-04Z1 to Malaysia starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.

  1. 01

    Request the datasheet

    The technical specification, marking target and conditions of use, sent by email.

  2. 02

    Ask for the certification schedule

    Which certificates are in progress, in what order, and what is still to be confirmed.

  3. 03

    Evaluate in a safe area

    Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.

  4. 04

    Register for launch

    Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.

Questions · Malaysia

Frequently asked questions

Can we buy an IECEx smartphone in Malaysia today?

Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.

What does an IECEx smartphone in Malaysia cost?

No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.

Does the IS-04Z1 hold an IECEx certificate?

No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.

Which sites in Malaysia does this cover?

The market guide for Malaysia covers Pengerang, Johor, Kertih, Terengganu, Gebeng, Pahang, Bintulu, Sarawak, among others. Site-level pages are linked below.

How will SAMS supply Malaysia?

Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.

Does Malaysia's climate affect which intrinsically safe phone I should choose?

Malaysia is hot and humid, so check the stated operating temperature range, ingress protection rating and battery behaviour at the top of that range. Offshore and coastal sites also add salt-laden air, which makes sealed connectors and charging contacts worth checking.

Are Petronas sites different from other Malaysian industrial sites for handheld devices?

Petronas and its operating companies typically apply their own site procedures on top of national law, including permit-to-work and device registration. Requirements vary by facility and contractor, so ask the site HSE office for its current device and induction rules.

Do I need separate approval for the radio in Malaysia?

Radio equipment is regulated separately from explosion protection. The programme lists MCMC certification through SIRIM QAS for the communications side, alongside IECEx for the hazardous area side, and both are in progress. Check with your supplier and the site operator which evidence your site requires before enrolling any device.

Enquiry · Malaysia

Ask about the IS-04Z1 for Malaysia

Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.

Enquiry · Malaysia

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Malaysia?

Name the site and the operator and we will send what is available before launch.