Petrobras: projects and investment
In 2023 the company announced the resumption of a new production line at the Abreu e Lima refinery in Ipojuca, Pernambuco, intended to refine heavy crude from the pre-salt region.
Petrobras is a majority state-owned Brazilian integrated oil and gas company headquartered in Rio de Janeiro. It operates offshore production in the Campos and Santos basins, including pre-salt fields, and a network of refineries across Brazil. Buyers searching for an IECEx smartphone supplier for Petrobras can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An IECEx smartphone for Petrobras cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Petrobras: Gas processing, Fuel terminals, Offshore platforms and FPSOs | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Brazil. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
Suppliers register through the Petronect portal: identify the company, select supply families, submit documents and pass technical evaluation to receive a registration certificate (CRC). The Corporate Registry is open to foreign companies; the Simplified Registry is for Brazilian companies only. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
In 2023 the company announced the resumption of a new production line at the Abreu e Lima refinery in Ipojuca, Pernambuco, intended to refine heavy crude from the pre-salt region.
Biofuel operations cover biodiesel and ethanol, including sugar-cane related activities, adding ethanol and biodiesel handling areas to the usual oil and gas hazards.
Brazil accounted for 92% of Petrobras's worldwide production in 2014, and daily output was reported at about 2.99 million barrels of oil equivalent in 2025, so most activity is concentrated domestically.
Its refineries include REPLAN at Paulinia (listed at about 415,000 barrels a day), REDUC at Duque de Caxias, RNEST at Suape and REFAP at Canoas, spread across several states.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Petrobras. Pre-salt development brings international operators, shipyards and EPCs to Brazil, and many of them already use IECEx documentation. A certificate of conformity with its schedule of conditions gives Petrobras reviewers and these visiting contractors one shared document. The IS-04Z1 is designed towards IECEx, which is still in progress.
There is no stock to order for Petrobras yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Suppliers register through the Petronect portal: identify the company, select supply families, submit documents and pass technical evaluation to receive a registration certificate (CRC). The Corporate Registry is open to foreign companies; the Simplified Registry is for Brazilian companies only.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Brazil has its own conformity scheme for equipment in explosive atmospheres, normally run through INMETRO-accredited bodies, rather than relying on ATEX alone. Confirm with Petrobras and the certification body which marking and local certificate are accepted before supplying handheld devices.
Portuguese is the working language across Brazilian sites, so manuals, quick guides and training material are normally expected in Portuguese, with English often acceptable for engineering review. Ask the site's HSE or procurement team which language and format their approval process requires.
Offshore adds salt spray, limited connectivity and confined topsides areas, while refineries have larger process units and more fixed network coverage. Both need the device marking checked against that unit's classification. The IS-04Z1 is not yet certified. Check area documents and the battery plan with Petrobras before use.
Other guides for Petrobras, other places in Brazil, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.