ADNOC: logistics and access
In May 2026 ADNOC announced it would accelerate its West-East Pipeline project, doubling oil export capacity through the port of Fujairah, with the expanded line expected to operate by 2027.
ADNOC is the Abu Dhabi state-owned energy group, with subsidiaries across upstream, midstream and downstream activities including refining, gas processing and petrochemicals. Its website quotes oil production capacity of 4.85 million barrels a day, and its group companies run large onshore and offshore sites. Buyers searching for an IECEx smartphone supplier for ADNOC can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An IECEx smartphone for ADNOC cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | ADNOC: LNG trains at Das Island, Refinery process units, NGL fractionation | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in United Arab Emirates. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
ADNOC's website links suppliers to the ADNOC Supplier Hub, which has a supplier registration service and an In-Country Value (ICV) programme section; the page content could not be read in full, so confirm current requirements with the relevant group company. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
In May 2026 ADNOC announced it would accelerate its West-East Pipeline project, doubling oil export capacity through the port of Fujairah, with the expanded line expected to operate by 2027.
ADNOC Drilling, formerly National Drilling Company, is ADNOC's oldest subsidiary and the largest drilling company in the Middle East, drilling both onshore and offshore in Abu Dhabi.
ADNOC was founded in 1971 and now has 16 subsidiary companies across upstream, midstream and downstream activities, so site practice can differ from one group company to another.
ADNOC Industrial Gas, founded in 2007 with Linde, makes industrial gases used by the oil, gas and petrochemical industries and works closely with gas processing.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In ADNOC. ADNOC works with many international operators and contractors across Ruwais, Das Island and Umm Al Nar. IECEx is a familiar reference for them. A reviewer should read the certificate of conformity with the schedule of conditions. The IS-04Z1 is designed for IECEx, and certification is in progress.
Supply of the IS-04Z1 to ADNOC starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
ADNOC's website links suppliers to the ADNOC Supplier Hub, which has a supplier registration service and an In-Country Value (ICV) programme section; the page content could not be read in full, so confirm current requirements with the relevant group company.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Das Island and offshore platforms involve marine transfer, salt air, high humidity and strong heat, plus controlled access by boat or helicopter. Check corrosion resistance, ingress protection and temperature range, and ask the operator about transfer rules and any restrictions on batteries or devices.
Typically gas processing trains, LNG and NGL units, refinery process areas, petrochemical plants and offshore platforms. Each ADNOC group company classifies its own facilities, so request the hazardous-area drawing, gas group and temperature class from the specific operating company before choosing equipment.
The sheet says suppliers are directed to ADNOC's supplier registration (the ADNOC Commercial Directory, now under its Supplier Hub) for Group tenders, and an In-Country Value certificate is generally required, per third-party guides. Confirm with the relevant group company. The IS-04Z1 has no certificate.
More on ADNOC, and on other places in United Arab Emirates.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.