Hot semi-arid climate
Summers are extremely hot and dry, with record highs above 50 C, and winters are mild with moderate rain.
Telecom equipment sold in Iraq needs Communications and Media Commission type approval, with certificates valid for one year and a local partner involved. The Baba and Avanah domes and the adjacent Bai Hassan, Jambur and Khabbaz fields are operated by the North Oil Company. This page explains what to look for in an IECEx smartphone for Kirkuk, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Kirkuk: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Kirkuk: Wellheads and gathering stations, Gas processing, Crude pumping and pipeline facilities | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kirkuk. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Summers are extremely hot and dry, with record highs above 50 C, and winters are mild with moderate rain.
The fields have produced for decades, so work centres on rehabilitation, maintenance and well work; a BP redevelopment contract was finalised in 2025.
BP signed a preliminary deal to develop the Kirkuk, Bai Hassan, Jambur and Khabbaz fields, which it estimates hold about nine billion barrels of recoverable oil, under a profit-sharing model.
Summers from May to October are very hot and dry with temperatures above 46 degrees Celsius, and dry dusty winds are common.
Kirkuk field was discovered at Baba Gurgur in 1927 and brought into production in 1934 when export pipelines were completed, and it has remained the most important part of northern Iraq's output.
The field had over 10 billion barrels of proven remaining reserves in 1998, so it is a mature, large-scale operation with legacy infrastructure.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Kirkuk. A redevelopment contract finalised in 2025 means international partners and EPC teams are active around Kirkuk's fields, and they usually work from IECEx documentation. The scheme provides a certificate of conformity and a schedule of conditions. IECEx certification for the IS-04Z1 is in progress, so no certificate can be shown now.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are wellheads and gathering stations, gas processing, crude pumping and pipeline facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
The North Oil Company and any partner operators run site permits and supplier checks. Ask your sponsor for the current procedure and for the equipment approval list.
Older plants may have mixed equipment and documentation, so confirm the actual area classification and gas group before taking devices on site. The operator can supply current drawings.
Access to oilfield sites is normally by operator-issued permit, so visits and deliveries need advance planning. Agree the permit route with the operator or its contractor before shipping, and allow time for formal tender and approval steps. Confirm the process with the site operator.
More on Kirkuk, and on other places in Iraq.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.