Refinery modernisation
The modernised refinery is ramping up towards about 405,000 barrels a day, and contractors were still completing final units into late 2025 and early 2026.
Sitra is an island on the east side of Bahrain Island whose northern part is an industrial area. It hosts the Bapco Sitra refinery, whose $7 billion modernisation was inaugurated in December 2024, and the GARMCO aluminium rolling mill, so refinery and heavy-industry hazardous areas are present. Distribution partners for Sitra, Bahrain are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Sitra, Bahrain has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Sitra, Bahrain: Crude and product storage, Hydrogen and hydrocracking units, Sulphur recovery units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Sitra. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
The modernised refinery is ramping up towards about 405,000 barrels a day, and contractors were still completing final units into late 2025 and early 2026.
The northern part of the island is an industrial area, with oil storage in the south and a gas pipeline link to Saudi Arabia.
Bapco oil storage reservoirs are in the south of the island, and Sitra is the terminus of a 42 km pipeline linking it to Dhahran in Saudi Arabia.
The Bahrain Extrusion Company has operated an aluminium extrusion plant in the Sitra industrial zone since March 1977, so metal-working sits alongside oil facilities.
Sitra is an island about 5 km south of Manama, and its northern section has been turned into an industrial area.
In 2018 Bapco commissioned a new pipeline to replace pipeline infrastructure more than 70 years old between Bahrain and Saudi Arabia.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Sitra, Bahrain. With the Sitra refinery ramping up towards about 405,000 barrels a day and contractors from abroad on site, an IECEx certificate of conformity with its schedule of conditions is the kind of document international teams already know. The IS-04Z1 aims for IECEx certification, which is still in progress and not yet held.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Sitra, Bahrain. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are refinery process units, crude and product storage, hydrogen and hydrocracking units, sulphur recovery units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Sitra, Bahrain.
Aluminium extrusion and metal-working can produce metal dust in some processes, so some areas may have dust classification; the refinery is mostly gas and vapour. Ask the operator for its dust zone survey.
A bridge built in the 1930s links the island to Bahrain Island, and Manama is about 5 km away. Contractors normally go through each operator's gate with induction and permits.
Usually only if the operator's permit-to-work and equipment rules allow it, and for classified areas only if the device carries a suitable Ex marking. Refinery contractors generally follow the operator's registration systems. Confirm current requirements with the site operator before mobilising any fleet.
Other guides for Sitra, other places in Bahrain, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Name the site and the operator and we will send what is available before launch.