Power stations
Ballylumford, owned by EP UK Investments since 2019, is the region's largest power station and runs on natural gas. Coolkeeragh near Derry is a 400 MW gas-fired plant owned by ESB.
Northern Ireland is a UK region with gas-fired power stations, the Scotland-Northern Ireland gas pipeline landing at Islandmagee and a proposed gas storage cavern project there. Zone 1 work arises at power stations, gas transmission assets and fuel storage. An IECEx smartphone distributor in Northern Ireland would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Northern Ireland has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Northern Ireland: Gas pressure reduction sites, Fuel storage, Gas-fired power station fuel systems | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Northern Ireland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Ballylumford, owned by EP UK Investments since 2019, is the region's largest power station and runs on natural gas. Coolkeeragh near Derry is a 400 MW gas-fired plant owned by ESB.
Mutual Energy owns the Scotland-Northern Ireland pipeline, the Belfast gas transmission pipeline from Islandmagee, and the Moyle electricity interconnector.
The electricity grid is operated by SONI and run by Northern Ireland Electricity, connected to the Republic by interconnectors of up to 1,200 MW and to Great Britain by the 500 MW Moyle interconnector.
Machinery and equipment manufacturing, food processing, textile and electronics manufacturing are the leading industries, concentrated mostly in the eastern parts of Northern Ireland around Belfast.
The Belfast yard has sea access through the Victoria Channel with no locks or height restrictions, 24-hour ISPS-approved security, and two airports close by: George Best Belfast City five minutes away and Belfast International under 30 minutes.
Key industries in 2024 include aerospace, agriculture, construction, engineering, health technology and manufacturing, and engineering is the largest manufacturing sub-sector, particularly aerospace and heavy machinery.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Northern Ireland. Power station and gas pipeline owners such as Mutual Energy and ESB operate across borders, so contractors and visiting specialists may bring IECEx documentation. The aim is a certificate of conformity and a schedule of conditions that can be read against a specific area. It is still in progress and cannot be relied upon yet.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Northern Ireland. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are gas-fired power station fuel systems, gas transmission pipeline assets, gas pressure reduction sites, fuel storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Northern Ireland.
Northern Ireland remains under EU product rules for many goods, so CE and ATEX marking is generally relevant there, while Great Britain uses UKCA. Requirements can change, so confirm with the operator and the certifying body which marking is accepted for portable Ex equipment on your site.
Likely locations include fuel and gas terminals at Belfast harbour, gas network compressor and pressure reduction sites, food and feed plants with dust risks, and shipyard and marine repair work. Zoning is site-specific, so ask the operator for area classification drawings before choosing handheld devices.
Gas-fired power stations such as Ballylumford and Coolkeeragh, the Mutual Energy gas pipeline network from Islandmagee, pressure reduction sites and fuel storage. A proposed gas storage cavern project at Islandmagee has not been confirmed in the sources checked, so ask the operators about project timing.
Related guides for Northern Ireland and for United Kingdom.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.