Mature fields
The fields have produced for decades, so work centres on rehabilitation, maintenance and well work; a BP redevelopment contract was finalised in 2025.
Kirkuk is the centre of northern Iraq's oil industry; the Baba Gurgur discovery in 1927 launched exports from the Kirkuk field. The Baba and Avanah domes and the adjacent Bai Hassan, Jambur and Khabbaz fields are operated by the North Oil Company. An IECEx smartphone distributor in Kirkuk would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Kirkuk has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Kirkuk: Wellheads and gathering stations, Gas processing, Crude pumping and pipeline facilities | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kirkuk. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
The fields have produced for decades, so work centres on rehabilitation, maintenance and well work; a BP redevelopment contract was finalised in 2025.
Access to oilfield sites is normally by operator-issued permit, so plan visits and deliveries ahead.
Kirkuk field was discovered at Baba Gurgur in 1927 and brought into production in 1934 when export pipelines were completed, and it has remained the most important part of northern Iraq's output.
The field had over 10 billion barrels of proven remaining reserves in 1998, so it is a mature, large-scale operation with legacy infrastructure.
The Kirkuk-Ceyhan crude pipeline runs about 970 km to the Turkish coast with two lines of 46 and 40 inches and a combined design capacity of 1.5 million barrels a day, making it Iraq's largest export line.
Iraq's winters are cooler and wetter, with average temperatures around 10 degrees Celsius, and the north sometimes falls below freezing.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Kirkuk. A redevelopment contract finalised in 2025 means international partners and EPC teams are active around Kirkuk's fields, and they usually work from IECEx documentation. The scheme provides a certificate of conformity and a schedule of conditions. IECEx certification for the IS-04Z1 is in progress, so no certificate can be shown now.
A distributor for Kirkuk would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are wellheads and gathering stations, gas processing, crude pumping and pipeline facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Kirkuk.
BP signed a preliminary agreement for four Kirkuk-region fields, with a profit-sharing model reported. The detailed timing and scope depend on final contracts, so check status with the operator.
Oil wells, gathering stations, separators, storage tanks, and gas processing and flare systems across the Kirkuk, Bai Hassan, Jambur and Khabbaz fields. Zones are set by the operator for each facility.
The equipment depends on the area classification, not the age of the field. Rehabilitation and well work may open or alter classified areas, so the operator's current zone drawings apply. Ask the operator for them before selecting a device, whatever the field's history.
Other guides for Kirkuk, other places in Iraq, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.