Mostorod refinery
The refinery northeast of Cairo came onstream in 1973 and has a reported capacity of about 161,000 barrels per day.
Cairo is a city rather than a single industrial site; the hazardous-area sites are in its surroundings. They include the Cairo Oil Refining Company's Mostorod refinery in Qalyubia, Helwan Cement to the south, and the large industrial zone of 10th of Ramadan City. An IECEx smartphone distributor in Greater Cairo would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Greater Cairo has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Greater Cairo: Cement kiln fuel areas, Factory solvent and gas areas, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Cairo. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The refinery northeast of Cairo came onstream in 1973 and has a reported capacity of about 161,000 barrels per day.
Helwan Cement began operating in 1929 and has about 4 million tonnes per year of capacity; a USD 30 million waste heat recovery plant was announced.
Natural gas made up 84% of Egypt's electricity mix in 2023, and Egypt produced 45% of Africa's gas-fired electricity in 2022, so gas-fired power stations and gas networks are the backbone of the national grid.
The Cairo Metro opened in 1987, is the oldest metro system in Africa and has over 1 billion passenger rides a year, so underground and railway systems are a major source of civil and electrical work.
Egypt's national oil company is the Egyptian General Petroleum Corporation, and Egypt has the sixth-largest proved oil reserves in Africa, over half of them offshore.
Cairo lies near the Nile Delta, was founded in 969 and is Egypt's capital and a regional centre of finance and commerce, so many buyers and contractors are based there even when sites are elsewhere.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Greater Cairo. The Mostorod refinery is run by the Cairo Oil Refining Company under EGPC, while Helwan Cement belongs to Heidelberg Materials Egypt, an international group. IECEx documentation, including a certificate of conformity and schedule of conditions, is a familiar reference there. The IS-04Z1 is designed for the route; nothing is issued.
A distributor for Greater Cairo would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are refinery process units, fuel storage, cement kiln fuel areas, factory solvent and gas areas. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Greater Cairo.
Cairo is mainly a commercial and administrative hub, though the wider region has power stations, fuel depots and industrial plants with classified areas. Buyers and project teams often work from Cairo for sites elsewhere. Confirm the exact site and its zone classification with the operator.
Each operator and its parent organisation sets its own equipment approval and supplier registration, commonly asking for IECEx or ATEX certification against IEC 60079. Procedures differ between companies, so ask the procurement and HSE departments for current requirements and sample documentation.
Cairo itself is a city, and the relevant sites are in its surroundings: the Mostorod refinery in Qalyubia, Helwan Cement to the south, and factories in 10th of Ramadan City. Each has its own areas and rules. Ask the individual operator which zones exist and what equipment it accepts.
More on Cairo, and on other places in Egypt.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.