Qatargas: background
Qatargas was set up in 1984 as a joint venture with ExxonMobil and others. Its first three LNG trains, each designed for 3.3 million tonnes a year, were built in 1996, 1997 and 1998.
Qatargas was established in 1984 and now trades as QatarEnergy LNG, a QatarEnergy company that develops and produces gas from the North Field and operates LNG facilities at Ras Laffan Industrial City. Its upstream assets are in Ras Laffan and its headquarters are in Doha. Buyers searching for an IECEx mobile phone supplier for Qatargas can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An IECEx mobile phone for Qatargas cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Qatargas: Onshore gas processing, Helium production, LNG liquefaction trains | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Qatar. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Where it operates and the kinds of classified area a handset would meet there.
QatarEnergy LNG is part of the QatarEnergy group, whose Supply Management section describes vendor registration through the Mushtaryat Portal (SAP Vendor Code) and a Preferred Manufacturers List; confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
Qatargas was set up in 1984 as a joint venture with ExxonMobil and others. Its first three LNG trains, each designed for 3.3 million tonnes a year, were built in 1996, 1997 and 1998.
QatarEnergy LNG, formerly Qatargas, produces about 77 million tonnes of LNG a year from seven ventures, and has its headquarters in Doha with its upstream assets at Ras Laffan.
The Laffan Refinery was inaugurated in 2010, and a major diesel hydrotreater was added during the Laffan Refinery 2 expansion, so condensate refining sits alongside LNG at Ras Laffan.
LNG leaves Ras Laffan on large Q-Flex and Q-Max carriers, and Qatargas also commissioned the Map Ta Phut LNG terminal in Thailand in 2011, so marine loading and berth operations are a core activity.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Qatargas. The company describes 14 LNG trains at Ras Laffan, a scale that draws international EPCs, shutdown contractors and visiting specialists. For them IECEx documentation is a common reference. A reviewer should read the certificate of conformity with the schedule of conditions. The IS-04Z1 is designed for IECEx, but certification is still in progress.
Supply of the IS-04Z1 to Qatargas starts only after certification, through authorised distributors. Until then a buyer can request the datasheet and the written certification schedule, and arrange a safe-area evaluation unit, which puts the site on the list for the right local channel at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
QatarEnergy LNG is part of the QatarEnergy group, whose Supply Management section describes vendor registration through the Mushtaryat Portal (SAP Vendor Code) and a Preferred Manufacturers List; confirm current requirements with its procurement and HSE teams.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
The site is a coastal desert location with high summer heat, humidity and salt in the air, plus dust. Check enclosure ingress protection, corrosion resistance and the operating temperature range of any device, and confirm area-specific rules with the operator rather than assuming one standard across all facilities.
Typically LNG liquefaction trains, gas treatment and sulphur units, helium and condensate handling, jetty and loading areas, and offshore platforms feeding Ras Laffan. The operating company classifies each area, so ask for the zone drawings, gas group and temperature class before specifying a phone or tablet.
According to the sheet, Qatargas was rebranded QatarEnergy LNG in September 2023 and is a QatarEnergy company operating LNG ventures at Ras Laffan Industrial City. Procurement and HSE requirements should be confirmed with the company. The IS-04Z1 is pre-launch and has no certificate.
More on Qatargas, and on other places in Qatar.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.