Gas export
Pre-salt gas reaches the onshore Boaventura plant at Itaborai through the Rota 3 pipeline.
Two new pre-salt platforms started in 2025 in the Santos Basin: the FPSO Almirante Tamandaré at the Búzios field and the FPSO Alexandre de Gusmão at the Mero field. Its FPSOs create Zone 1 areas on process decks and in storage and offloading areas. This page explains what to look for in an IECEx mobile phone for Santos Basin, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Santos Basin: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Santos Basin: Platform process modules, Wellhead areas, Gas compression and export | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Santos Basin. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Pre-salt gas reaches the onshore Boaventura plant at Itaborai through the Rota 3 pipeline.
Fields use FPSOs; Buzios alone reached 1 million barrels of oil equivalent a day operated with six platforms.
Petrobras reported pre-salt production of 2.45 million barrels of oil equivalent a day in 2025, about 82% of its total output, which shows how much of its production now comes from pre-salt fields.
The Santos Basin spans about 352,000 km2, mostly offshore, around 300 km southeast of Santos, and borders the coasts of Rio de Janeiro, Sao Paulo, Parana and Santa Catarina states.
Giant fields found since 2007 include Tupi (about 8 billion barrels), Jupiter (about 1.6 billion barrels and 17 trillion cubic feet of gas) and Libra, estimated at 8 to 12 billion recoverable barrels.
Pre-salt reservoirs are ultra-deep carbonates, roughly 5,000 to 7,000 m total depth below a thick salt seal, which drives the high-pressure, high-temperature design of wells and topsides.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Santos Basin. Large floating units in the Santos Basin involve global contractors and shipowners. IECEx, with a certificate of conformity and schedule of conditions, is a familiar framework for them, alongside Brazil's Inmetro-accredited route. The IS-04Z1 IECEx certification is in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are platform process modules, wellhead areas, gas compression and export, offloading areas. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Typically the turret and riser area, process and gas treatment decks, compression and CO2 handling areas, crude storage and offloading, and helideck fuel. Zones, gas groups and temperature classes are on the unit's classification drawings, so request them before choosing handheld devices.
The basin lies roughly 300 km southeast of Santos and the best-known discoveries are far offshore in deep water, so crew changes are mainly by helicopter and supply is by vessel. Confirm carry-on rules for powered devices with the operator.
Pre-salt units are far offshore, so crews and equipment move by helicopter and supply vessel. Spares need planning in advance. Confirm approvals, documentation and delivery routes with the operator and its contractors before relying on offshore replacement.
More on Santos Basin, and on other places in Brazil.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.