Underground storage
Jurong Rock Caverns, 150 metres below ground, can store up to 1.47 million cubic metres (around 9 million barrels) of liquid hydrocarbons, adding below-ground classified areas.
Singapore Refining Company runs a refinery on Jurong Island able to process 290,000 barrels of crude a day, producing fuel products and chemical feedstocks for domestic and export markets. It hosts over 100 global companies in refining, olefins and chemical manufacturing, so gas and vapour (Zone 1) areas are widespread. This page explains what to look for in an IECEx mobile phone for Jurong Island, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Jurong Island: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Jurong Island: Marine jetties, Refinery and cracker process units, Chemical and petrochemical plants | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Jurong Island. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Jurong Rock Caverns, 150 metres below ground, can store up to 1.47 million cubic metres (around 9 million barrels) of liquid hydrocarbons, adding below-ground classified areas.
JTC states that the island also hosts power generation and desalination plants and supports Singapore's natural gas supply, so work there covers utilities as well as process plants.
Singapore produces no crude oil or feedstock of its own, so Jurong Island plants run on imported material delivered by sea, which makes jetties, tank farms and transfer lines a constant feature of the site.
The caverns hold about 9.2 million barrels across five isolated storage caverns and store crude oil, condensate, naphtha and gasoil, so vapour-handling surface facilities sit above a very large underground inventory.
Visitors enter through the Jurong Island Checkpoint, where they exchange an identity card or passport for a Jurong Island visitor pass before travelling on to the plant they are visiting.
One refinery on the island forbids mobile phones and other electrical or electronic equipment in its process plant and classified hazardous areas, and requires visitors to declare cameras, computers and laptops at security.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Jurong Island. With so many multinational operators on one island, IECEx is a common shared reference for contractors who work in several countries. The certificate of conformity and schedule of conditions would be reviewed by each plant's HSE team. For the IS-04Z1 these are targets only, as certification is in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are refinery and cracker process units, chemical and petrochemical plants, lng storage and loading, underground rock cavern storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Usually not into process or classified areas unless the equipment is approved for the zone and the operator permits it. One refinery on the island publishes a ban on phones and other electronic equipment in those areas. Ask your site sponsor which devices are accepted and whether a permit is needed.
One refinery on the island states a crude processing capacity of 290,000 barrels a day, and other chemical and refining operators share the same island. Because feedstock arrives by sea, expect busy jetty, tank and pipeline areas where Zone 1 and Zone 2 conditions are common.
Not automatically. Each plant runs its own contractor and equipment approvals and permit system, so a device accepted at one plant may need separate approval at another. Ask each plant's HSE team for its process, and plan enrolment and permits per client.
More on Jurong Island, and on other places in Singapore.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.