Regulation
DSEAR applies, and the UK recognises CE marking alongside UKCA for Great Britain, with the recognition period currently running to 31 December 2027.
Employers must identify and classify areas where explosive atmospheres may occur and avoid ignition sources, for example from unprotected equipment, in those areas. Lindsey stopped refining in 2025. If you are specifying an IECEx mobile phone for England, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for England: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | England: Refinery process units, Fuel terminals and tank farms, Marine oil jetties | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in England. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
DSEAR applies, and the UK recognises CE marking alongside UKCA for Great Britain, with the recognition period currently running to 31 December 2027.
Reported capacities are roughly 270,000 barrels a day at ExxonMobil's Fawley on Southampton Water, about 296,000 at Stanlow in Cheshire and about 221,000 at Phillips 66's Humber site in North Lincolnshire.
Major-hazard sites fall under the Control of Major Accident Hazards Regulations 2015, with HSE publishing guidance and public information on establishments covered, so top-tier and lower-tier sites follow a further regime.
HSE lists dangerous substances as including solvents, paints, varnishes, flammable gases such as LPG, dusts from machining, sanding and foodstuffs, pressurised gases and substances corrosive to metal.
DSEAR duties fall on employers and the self-employed and also protect members of the public who may be put at risk by work activity, so contractors share responsibility with site owners.
In Great Britain, the 2016 EPS Regulations implement the ATEX equipment directive, and the UK government has extended recognition of goods meeting EU requirements, including CE marking, indefinitely beyond 2024 for many products, in force from 1 October 2024.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In England. England's refineries, marine jetties and petrochemical units draw in international EPCs and turnaround contractors, many of whom hold IECEx-based documentation. The aim is a certificate of conformity and a schedule of conditions that can be read against a particular area, once certification is complete. At present that paperwork is still in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are refinery process units, fuel terminals and tank farms, marine oil jetties, petrochemical units. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
The Health and Safety Executive, and in some premises local authorities, enforce DSEAR. They expect employers to carry out a risk assessment, classify areas and control ignition sources. Ask your client which assessments and records apply to your work.
Yes. HSE lists dusts from machining, sanding and foodstuffs among dangerous substances, so combustible dust areas can be classified in the same way as gas areas. Check whether your task is near flour, wood, metal or grain handling and ask for the zone classification.
England hosts three of the UK's four operating refineries: Fawley, Stanlow and Humber. Fuel terminals, gas networks and chemical sites also contain classified areas. Lindsey stopped refining in 2025. Each operator assesses its own zones, so confirm requirements with the site operator for the specific site.
Related guides for England and for United Kingdom.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.