OQ: background
OQ traces back to Oman Refinery Company (1982) and Oman Oil Company (1996), and took its present form in 2019 when Oman Oil Company merged with the refining and petrochemical company Orpic.
The Duqm Refinery and Petrochemical Complex is a joint venture announced in 2017 between OQ and Kuwait Petroleum International, with construction of the refinery starting in 2018. Its refining arm, OQ Refineries and Petroleum Industries, runs the Sohar and Mina Al Fahal refineries, and OQ is a partner in the Duqm refinery joint venture (OQ8). If you are specifying an IECEx mobile phone for OQ, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for OQ: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | OQ: Refinery process units, Petrochemical plants, Fuel and crude storage terminals | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Oman. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of its operations and the kinds of classified area that matter for portable equipment.
OQ reports more than 13,000 registered vendors and suppliers and has a Vendors page on its website; confirm current registration and equipment approval requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
OQ traces back to Oman Refinery Company (1982) and Oman Oil Company (1996), and took its present form in 2019 when Oman Oil Company merged with the refining and petrochemical company Orpic.
The Sohar Refinery Improvement Project began construction in 2014, and the 2018 programme also included groundwork for the Salalah LPG and Salalah Ammonia projects.
OQ held a 40 per cent share in the Khazzan gas field until 2018, when it sold 10 per cent of that stake to Petronas, and it also signed concessions with Occidental that year.
OQ is wholly owned by the Government of Oman through the Oman Investment Authority and works in energy infrastructure, refining, petrochemicals, oil marketing and power, across 17 countries.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In OQ. OQ's refineries and the Duqm joint venture bring international partners and contractors who tend to hold IECEx documents. They look for a certificate of conformity and its schedule of conditions. IECEx is a target for the IS-04Z1 and remains in progress, so treat it as a planned route and not an approval already held.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
OQ reports more than 13,000 registered vendors and suppliers and has a Vendors page on its website; confirm current registration and equipment approval requirements with its procurement and HSE teams.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Typically the refinery process areas at Sohar and Mina Al Fahal, petrochemical and polymer plants, the LPG and ammonia facilities at Salalah and the large crude and product terminals. OQ or the site operator issues the area classification, so request the hazardous-area drawing before specifying equipment.
The Duqm Refinery and Petrochemical Complex is a joint venture between OQ and Kuwait Petroleum International, so contractors may deal with the joint venture company rather than OQ directly. Ask the project or operating team who issues site access and equipment approvals before shipping devices.
Not necessarily. Duqm is a 50:50 joint venture, so its operating company may have its own procurement and HSE rules. Confirm the operating entity and its requirements. The IS-04Z1 has no certificate yet, and SAMS has appointed no distributor for Oman.
More on OQ, and on other places in Oman.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.