OQ: who works there
Oman Refineries and Petrochemicals Company was created in 2007 by merging Oman Refinery Company with Sohar Refinery Company, bringing the Mina Al Fahal and Sohar refineries under one operator.
OQ is an Omani integrated energy group wholly owned by the Government of Oman and part of the Oman Investment Authority, created in 2019 when Orpic merged with Oman Oil Company. OQ's subsidiary Oman Tank Terminal Company began building a crude oil storage terminal near Ras Markaz in 2017, a remote coastal site with large tank farms and marine loading. This page sets out how an intrinsically safe mobile phone supply route to OQ will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An intrinsically safe mobile phone for OQ cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | OQ: Refinery process units, Petrochemical plants, Fuel and crude storage terminals | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Oman. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of its operations and the kinds of classified area that matter for portable equipment.
OQ reports more than 13,000 registered vendors and suppliers and has a Vendors page on its website; confirm current registration and equipment approval requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.
Oman Refineries and Petrochemicals Company was created in 2007 by merging Oman Refinery Company with Sohar Refinery Company, bringing the Mina Al Fahal and Sohar refineries under one operator.
OQ traces back to Oman Refinery Company (1982) and Oman Oil Company (1996), and took its present form in 2019 when Oman Oil Company merged with the refining and petrochemical company Orpic.
The Sohar Refinery Improvement Project began construction in 2014, and the 2018 programme also included groundwork for the Salalah LPG and Salalah Ammonia projects.
OQ held a 40 per cent share in the Khazzan gas field until 2018, when it sold 10 per cent of that stake to Petronas, and it also signed concessions with Occidental that year.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In OQ. Operators at LPG extraction and storage areas and refinery units patrol spheres, pumps and loading points spread across large plants. A handheld intrinsically safe phone allows tag scanning, photographs and defect reports inside the classified area. It would suit turnaround support at Sohar and Mina Al Fahal, where contractors work near live units.
There is no stock to order for OQ yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
OQ reports more than 13,000 registered vendors and suppliers and has a Vendors page on its website; confirm current registration and equipment approval requirements with its procurement and HSE teams.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Coastal terminals such as Ras Markaz combine heat, salt-laden air and dust, so check the ingress protection rating, corrosion resistance of the enclosure and the operating temperature range, in addition to the gas group and temperature class. Confirm any marine or terminal-specific requirements with the terminal operator.
OQ is a group with several operating companies, joint ventures and terminals, and each can apply its own site rules. Check with the procurement and HSE team of the specific OQ company, such as the refining or terminal business, for current supplier registration and equipment approval steps.
Summer heat, humidity and dust are routine, and Salalah has a monsoon season. IP68 sealing helps with dust and water but is not explosion protection. Check the datasheet temperature range, test battery life locally, and ask OQ's HSE team how portable devices are charged and kept near LPG areas.
More on OQ, and on other places in Oman.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.