Poland: industry on the ground
The Płock refinery and petrochemical complex is the largest oil refinery in Poland, and Orlen's headquarters are in the same city, with servicing and construction firms clustered around the plant.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for the refinery, fertiliser and gas terminal work where Polish teams actually meet an explosive atmosphere. Poland's energy sector is the fifth largest in Europe, with an installed electricity capacity of about 61 GW at the end of 2024, so power plants and mines are large sources of classified areas. An IECEx mobile phone distributor in Poland would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Poland has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Poland: Włocławek, Puławy, Police | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Poland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Poland market guide covers.
The Płock refinery and petrochemical complex is the largest oil refinery in Poland, and Orlen's headquarters are in the same city, with servicing and construction firms clustered around the plant.
Coal use splits into 75.6% for electricity and heat, 14.5% for industry and 9.9% for buildings, so industrial coal consumers beyond power plants also have dust and gas hazards.
Poland produced 78 megatonnes of hard coal and 57 megatonnes of brown coal in 2009, and a plan agreed in September 2020 aims to phase out coal by 2049.
In 2020 coal made up 69.5% of national energy production and 68.5% of electricity generation, so coal handling, bunkers and mills create combustible dust zones at many power sites.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Poland. Poland hosts large national operators and international contractors working inside operating plant fences. IECEx gives foreign partners a common reference alongside ATEX, the main product route here. Ask for the certificate of conformity and its schedule of conditions, which record the marking and conditions of use. The IS-04Z1 has none yet issued.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Poland yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Poland covers Płock, Gdańsk, Włocławek, Puławy, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Poland.
Polish is the working language and ATEX instructions are typically expected in the language of the destination country. A Polish-language instruction sheet with certificate pack usually speeds up site acceptance. Ask the operator whether English documents are also accepted for contractors.
Poland is an EU member, so ATEX Directive 2014/34/EU applies to equipment and Directive 1999/92/EC to workplace zoning. Zone 1 and Zone 2 devices should carry CE and Ex markings with instructions in Polish. Operators and mines usually add their own approval rules.
The gas marking target is II 2 G Ex ib IIC T4, and Zone 21 dust protection belongs to the same programme, so one device is designed to cover both. Certification is in progress, so confirm the final marking and the plant's zone drawing with the operator.
Related guides for Poland and for Poland.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.