Dense urban setting
The refineries sit in the Mahul-Chembur area within the metropolitan region, which Wikipedia notes is surrounded by a number of chemical plants, so site access and security controls are normally strict.
Mumbai has two large refineries at Mahul and Trombay, BPCL's at about 13 million tonnes a year and HPCL's at 9.5 million tonnes a year. Refining, petroleum terminals and chemical plants create Zone 1 areas, and crude arrives from offshore fields such as Mumbai High. Distribution partners for Mumbai, Maharashtra are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Mumbai, Maharashtra has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Mumbai, Maharashtra: Marine oil handling, Chemical plants, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Mumbai India. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The refineries sit in the Mahul-Chembur area within the metropolitan region, which Wikipedia notes is surrounded by a number of chemical plants, so site access and security controls are normally strict.
HPCL's Mumbai refinery covers 321 acres and dates from 1954. BPCL's Mumbai refinery is one of India's oldest operating refineries, with expansion planned under its Project Aspire.
Mumbai is prone to flooding during monsoons, and occasionally experiences tropical cyclones, so site access and logistics can be disrupted.
Mumbai's industrialisation after the 1960s expanded petrochemicals, electronics and automobiles, and major refineries such as the Mumbai Refinery at Trombay and the BPCL refinery were established.
The Indian Institute of Technology Bombay and the Institute of Chemical Technology are among the major engineering schools, giving a strong local pool of chemical and process engineers.
Jawaharlal Nehru Port at Navi Mumbai, opened in 1989, has surpassed a capacity of 4 million TEU of containers, with 30 container freight stations and links to 52 inland container depots.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Mumbai, Maharashtra. Refinery projects at Mahul and Trombay involve international engineering firms alongside Indian contractors. An IECEx certificate of conformity with its schedule of conditions is a reference such firms compare across projects. SAMS is pursuing IECEx for the IS-04Z1, and nothing has been issued.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Mumbai, Maharashtra yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are refinery process units, petroleum storage terminals, marine oil handling, chemical plants. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Mumbai, Maharashtra.
Mumbai has refineries in the Trombay area, including the Mumbai Refinery and BPCL's refinery. Each operator has its own access and equipment rules, so confirm with the specific site.
The Telecommunication Engineering Centre has a regional centre in Mumbai that carries out tests and issues service test certificates. Ask your supplier which certification applies to your specific handset.
Site access and security controls around the Mahul-Chembur area are normally strict. Devices may be logged or inspected at the gate, and contractors may need induction. Confirm with the site operator what documentation a new device needs before it can enter.
Related guides for Mumbai India and for India.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.