Two sites
Fortune Indonesia reports the unit has been operating since 1971 and spans Dumai and Sungai Pakning, with products including LPG, jet fuel, diesel and green coke.
Dumai, on the Riau coast of Sumatra, hosts Pertamina's Refinery Unit II, with Dumai and Sungai Pakning sites and a combined capacity reported at 170,000 barrels per day. Crude processing, storage and marine loading create Zone 1 areas. Distribution partners for Dumai Refinery, Riau are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Dumai Refinery, Riau has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Dumai Refinery, Riau: Refinery process units, Crude and product tank farms, Marine loading jetties | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Dumai Refinery. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Fortune Indonesia reports the unit has been operating since 1971 and spans Dumai and Sungai Pakning, with products including LPG, jet fuel, diesel and green coke.
The Dumai crude unit is quoted at about 120,000 barrels per day within the 170,000 total; figures vary slightly by source.
The refinery generates the power it needs from natural gas supplied by fields in South Sumatra and Jambi, including Grissik, Bentu and Jambi Merang, which cuts its fuel cost by about 40 percent.
Dumai is on the coast of Riau Province in Sumatra and supplies the island with gasoline, aviation fuel, diesel, kerosene and LPG, so it is a regional distribution hub as well as a processing site.
Dumai's crude capacity is quoted at between roughly 127,000 and 170,000 barrels a day depending on the source, which places it among Indonesia's larger refineries.
Products include aviation turbine fuel, fuel oil, diesel, kerosene, solvents, LPG and green coke, so both flammable vapour and petroleum-coke dust may need consideration in area classification.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Dumai Refinery, Riau. The IECEx scheme gives visiting contractors a familiar reference when they move between Dumai, Sungai Pakning and other refineries. A certificate of conformity plus schedule of conditions would be reviewed. For the IS-04Z1 those documents are targets, not issued.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Dumai Refinery, Riau. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are refinery process units, crude and product tank farms, marine loading jetties. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Dumai Refinery, Riau.
Dumai is Pertamina's Refinery Unit II and its Sungai Pakning site is managed with it. Contractors and equipment suppliers usually register through Pertamina vendor processes and the unit's own safety induction, so confirm current requirements with the refinery.
National plans to upgrade the biggest refineries mean new process areas and construction activity beside operating units. Contractors in new areas typically follow the project's hazardous-area drawings, so check the classification for your specific work front rather than assuming existing plant limits.
The unit covers Dumai and Sungai Pakning, and each site has its own areas and drawings. Rules for devices are set by Pertamina, but practical details may differ. Ask the operator for requirements covering both sites. Confirm with the site operator.
Other guides for Dumai Refinery, other places in Indonesia, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.