Field scale
Ghawar measures about 280 by 30 km and is divided into zones including Ain Dar and Shedgum, Uthmaniyah, Hawiyah and Haradh, so sites are widely spread.
Al-Ahsa is the largest governorate in Saudi Arabia by area, with Hofuf as its seat and a 2022 population of about 1.1 million. The Ghawar oil field, the world's largest conventional field, lies within it and is operated by Aramco, creating Zone 1 areas at wells and gas handling facilities. An IECEx mobile phone distributor in Al-Ahsa (Hofuf) would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Al-Ahsa (Hofuf) has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Al-Ahsa (Hofuf): Water injection facilities, Pipeline pump stations, Oil wellsites and gathering | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Al Ahsa. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Ghawar measures about 280 by 30 km and is divided into zones including Ain Dar and Shedgum, Uthmaniyah, Hawiyah and Haradh, so sites are widely spread.
Hot desert climate with high summer temperatures and dust.
Saudi Arabia's Communications, Space and Technology Commission issues radio type-approval certificates, renewed every two years, and accepts European test documents for handsets.
Ghawar was discovered in 1948 and put on stream in 1951; it is entirely owned and operated by Saudi Aramco, so one operator's rules cover the oil-field work.
Aramco's 2019 bond prospectus put Ghawar's maximum output at 3.8 million barrels a day, well below the older market estimate of more than 5 million.
The governorate has fertile land and abundant water, and has historically been a trade crossroads linking Arabia with Persia and India.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Al-Ahsa (Hofuf). Ghawar is divided into zones such as Ain Dar and Shedgum, Uthmaniyah, Hawiyah and Haradh, and visiting contractors may bring IECEx familiarity from other regions. The certificate of conformity and schedule of conditions would be the documents reviewed. For the IS-04Z1 these are targets, not issued papers.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Al-Ahsa (Hofuf) yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are oil wellsites and gathering, associated gas handling, water injection facilities, pipeline pump stations. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Al-Ahsa (Hofuf).
Often yes. The Al-Ahsa oasis and Hofuf sit on the eastern flank of the Ghawar field, so wellsites, gas handling and pipelines can be near settlements and agricultural land. Follow the operator's access and gate procedures rather than assuming open public roads lead to sites.
Ghawar is divided into five production areas running north to south, and the governorate covers about 375,000 square km. Teams often travel long distances between sites, so plan device charging, spare batteries and offline documentation rather than relying on constant connectivity.
Ghawar is divided into several zones and sites are widely spread, so coverage and travel time vary. Ask the site operator about network coverage and whether devices need to work offline. Device management through EMM or MDM should be planned around that, and handsets are best charged at a safe base.
Related guides for Al Ahsa and for Saudi Arabia.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.