United States: rules and approvals
Full certification in the US includes quarterly factory inspections, while field certification offers an alternative for custom or low-volume equipment already at an installation.
The IS-04Z1 is built for people who work inside classified locations at American refineries, gas plants, terminals and wellsites, and for the HSE and IT teams who decide what goes through the gate. The Permian also yields potash, mined by the room-and-pillar method in Lea and Eddy counties in New Mexico, which adds mining and mineral-dust hazards to the oil and gas activity. Distribution partners for United States are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. United States has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | United States: Beaumont and Port Arthur, Lake Charles and Calcasieu, Baton Rouge corridor | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in United States. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Operators and classified areas drawn from the SAMS United States market guide.
Full certification in the US includes quarterly factory inspections, while field certification offers an alternative for custom or low-volume equipment already at an installation.
The National Electrical Code covers hazardous locations in Article 500 for the Class and Division system and in Articles 505 and 506 for the Zone system, as adopted by each state or authority.
The FCC regulates radio frequency devices between 9 kHz and 3000 GHz, and most radio-containing products must follow an equipment authorisation procedure before being marketed.
Zone-rated equipment in the US carries the AEx marking, for example Class I, Zone 0, AEx ia IIC T6, so a datasheet showing only ATEX or IECEx marks does not show US approval.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In United States. IECEx matters in the US through multinational operators and EPC crews, among them Bechtel, Fluor and KBR, who work to international schemes across projects at home and abroad. A certificate of conformity and its schedule of conditions gives them a common reference beside the NEC listing. The IS-04Z1 IECEx certification is in progress.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for United States. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for United States covers Permian Basin, Houston Ship Channel, Beaumont and Port Arthur, Lake Charles and Calcasieu, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for United States.
The basin is dry and sparsely built, so summer heat, dust and long drives between sites are typical. Check the operating temperature range, dust ingress rating and battery life, and confirm any operator-specific site rules, including permits and gas detection practice, with the company controlling the lease.
Radio-containing devices such as phones normally need FCC equipment authorisation, either by certification through an approved body or a supplier's declaration depending on the device type. Check the FCC rules and consult an accredited test lab or telecommunication certification body for your product's category.
The Zone 21 design target covers dust at sulfur handling, coal transfer and solids charging, but certification is in progress and no listing exists. Check which Class and Division the final listing covers against your facility's own classification before use.
Other guides for United States, other places in United States, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.