Umm Al Nar closed
ADNOC's older Abu Dhabi Refinery on Umm Al Nar Island, which processed up to 85,000 barrels a day, was shut in 2022 as ADNOC focused its downstream strategy on Ruwais.
ADNOC's Ruwais complex in Abu Dhabi's Al Dhannah area is the biggest refinery in the Middle East, with Ruwais Refinery East rated at over 922,000 barrels a day and Ruwais Refinery West at up to 417,000. UAE phones need type approval from the federal Telecommunications and Digital Government Regulatory Authority, and refinery operators add their own approval rules for portable devices. This page explains what to look for in a hazardous area smartphone for UAE refineries, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for UAE refineries: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | UAE refineries: Refinery process units, Tank farms, Loading jetties and gantries | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in UAE Refineries. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
ADNOC's older Abu Dhabi Refinery on Umm Al Nar Island, which processed up to 85,000 barrels a day, was shut in 2022 as ADNOC focused its downstream strategy on Ruwais.
Hot, humid Gulf coastal climate; outdoor equipment should resist heat and salt air.
The same list shows smaller Fujairah plants of 80,000, 7,500 and 70,000 barrels a day, so refining sites are scattered across the east coast as well as the Gulf.
Outside Abu Dhabi, the Jebel Ali refinery in Dubai is run by ENOC Processing Company, a subsidiary of ENOC, the Dubai government's energy group established in 1993.
A condensate splitter typically yields about half naphtha, 30 per cent jet fuel and 10 per cent gas oil, so light, easily ignited products dominate the process units.
Ruwais Refinery West opened in 2014 with 417,000 barrels a day and contains a very large residue catalytic cracking unit that upgrades about 127,000 barrels a day of heavy residue into middle distillates.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In UAE refineries. UAE refineries have process units, tank farms, loading jetties and gantries, and product pipelines. ADNOC, as operator, classifies its own areas, not SAMS. The Ruwais complex connects to three Gulf jetties and a pipeline network over 1,600 km long, so classified areas extend beyond the refinery fence.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are refinery process units, tank farms, loading jetties and gantries, product pipelines. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
No. ADNOC runs the Ruwais complex in Abu Dhabi, but Dubai's Jebel Ali refinery is run by ENOC Processing Company, a subsidiary of the Dubai government's energy group, and smaller plants operate at Fujairah. Each operator has its own supplier and equipment-approval process.
That depends on the project owner. ADNOC, ENOC and the Fujairah operators run separate procurement and HSE processes, so there is no single approval. Ask the client or main contractor which operator's standards apply, and check current requirements directly with that operator.
It groups ADNOC's Ruwais complex, the largest, and a smaller refinery at Umm Al Nar in Abu Dhabi. Current operating status of individual units has not been checked here. Ask ADNOC refining which units are active, and which areas your team will actually enter.
Related guides for UAE Refineries and for United Arab Emirates.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.