Ownership
Borouge Plc is 90 per cent owned by Borouge Group International, formed in March 2026 from Borouge, Borealis and NOVA Chemicals and backed by XRG (ADNOC's investment arm) and OMV.
Borouge operates a polyolefins complex at Ruwais in Abu Dhabi, producing polyethylene and polypropylene. Borouge employs more than 3,000 people of over 40 nationalities, so safety instructions and handset menus may need to work for a multilingual crew. If you are specifying a hazardous area smartphone for Borouge at Ruwais, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Borouge at Ruwais: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Borouge at Ruwais: Olefin and polyolefin process units, Polymer powder handling (Zone 21), Feedstock and gas storage | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Borouge Petrochemical. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Borouge Plc is 90 per cent owned by Borouge Group International, formed in March 2026 from Borouge, Borealis and NOVA Chemicals and backed by XRG (ADNOC's investment arm) and OMV.
Borouge Plc employs more than 2,900 people, with extra contractor staff during project phases.
UAE handsets need type approval from the Telecommunications and Digital Government Regulatory Authority, which introduced a new type approval mark taking effect on 1 January 2023.
The complex produces polyethylene and polypropylene using Borstar and Borlink technologies for packaging, infrastructure, energy, mobility, agriculture and healthcare uses, so both gas feedstock and polymer powder are handled.
Borouge was founded in 1998 through a partnership between ADNOC and Borealis to build and operate a petrochemical complex in Al Ruwais Industrial City.
Beyond the plant, Borouge uses logistics hubs, warehouses and gateways across the Middle East and Africa, Europe and Asia, so pellet packing and dispatch areas form a separate work zone.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Borouge at Ruwais. Borouge's areas include olefin and polyolefin process units, polymer powder handling, gas and feedstock storage, and utilities and pipelines. Borouge, as operator, owns the classification. SAMS does not classify areas and cannot say which zone applies to a specific unit; the plant's own drawings must answer that.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are olefin and polyolefin process units, polymer powder handling (zone 21), feedstock and gas storage, utilities and pipelines. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Typically flammable gas and liquid hydrocarbons in the cracker and reactor areas, plus combustible polymer powder and dust in handling, silo and bagging areas. Classification is set by the operator, so ask for gas group, temperature class and dust-zone drawings before specifying devices.
It adds new polyethylene, polypropylene and LDPE units, so construction and commissioning crews join the operating plant. Typically that means more contractor induction, tighter permit control and temporary classified areas; check requirements with the project's main contractor.
Ruwais has a hot, humid Gulf coast climate, so outdoor equipment should cope with heat and salt air. The IS-04Z1 is designed to IP68 with a 4,000 mAh battery, but no hot-weather runtime has been published. Ask for the datasheet and check operating limits with Borouge.
Related guides for Borouge Petrochemical and for United Arab Emirates.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.