Decarbonisation plans
EET Fuels has announced a 1.2 billion dollar decarbonisation programme, including a hydrogen-ready combined heat and power plant planned for 2027 to 2029, so project work is expected.
The Liverpool2 container terminal, completed in 2022, increased the port's capacity and allows it to handle the world's biggest container vessels. The Stanlow refinery at Ellesmere Port, on the Manchester Ship Canal, receives crude through the Tranmere Oil Terminal on the Mersey, so Zone 1 areas are found at the refinery, jetties and pipelines around the estuary rather than in the city. A hazardous area smartphone distributor in Liverpool and the Mersey would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Liverpool and the Mersey has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Liverpool and the Mersey: Product pipelines and pump stations, Tank farms, Refinery process units at Stanlow | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Liverpool. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
EET Fuels has announced a 1.2 billion dollar decarbonisation programme, including a hydrogen-ready combined heat and power plant planned for 2027 to 2029, so project work is expected.
Crude oil arrives at Tranmere on the Mersey and travels to Stanlow by pipeline of about 24 km.
In 2023 the UK government designated Liverpool a Freeport to encourage international commerce, which affects customs handling and site development around the port.
Liverpool hosts UK offices of shipping lines including Atlantic Container Line, Bibby Line, Hapag-Lloyd, Irish Ferries and Maersk, so marine buyers and technical managers are close together.
The Port of Liverpool is the UK's fourth busiest by freight tonnage, handling about 33 million tonnes in 2022, and is the largest port on the UK west coast.
The port handles about 45 percent of the UK's trade with the United States, and the city's economy also includes maritime, life sciences and advanced manufacturing sectors.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Liverpool and the Mersey. Liverpool's Zone 1 areas are not in the city but at the Stanlow refinery at Ellesmere Port, on the Manchester Ship Canal, and at the Tranmere Oil Terminal jetties and pipelines on the Mersey. The employer classifies them under DSEAR, not SAMS. Product pipelines, pump stations and tank farms are the other typical classified areas.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Liverpool and the Mersey. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are refinery process units at stanlow, marine oil terminal jetties, product pipelines and pump stations, tank farms. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Liverpool and the Mersey.
The maritime climate brings frequent rain and sea wind, and salt air affects connectors and charging contacts. Typically devices need good ingress protection and routine cleaning, and users should check ratings against the port's rules.
Liquid bulk handling, dry bulk such as coal, grain and biomass, fuel and chemical storage and vessel operations. Vapour and dust zones can arise at jetties, silos and conveyors, so ask the terminal operator for its zone drawings and portable-device rules.
EET Fuels has announced a decarbonisation programme that includes a hydrogen-ready combined heat and power plant planned for 2027 to 2029, so project work is expected. Plans can change. A buyer should ask the operator or its contractors what equipment and marking they will require for those areas.
More on Liverpool, and on other places in United Kingdom.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.