Coastal desert climate
Summers are very hot and the site is coastal, so heat, dust and humidity all affect outdoor equipment.
Summer daily highs average 42 to 46 degrees Celsius, so outdoor refinery and wellsite work faces strong heat for much of the year. The Greater Burgan field and the Mina Al-Ahmadi refinery, with a stated capacity of 346,000 barrels a day, are close by. Distribution partners for Al Ahmadi are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Al Ahmadi has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Al Ahmadi: Crude and product storage, Marine loading facilities, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Al Ahmadi. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Summers are very hot and the site is coastal, so heat, dust and humidity all affect outdoor equipment.
The town grew around the oil companies, so operator staff, contractors and service firms are concentrated in a small area.
Mina Al-Ahmadi began producing ultra-low-sulphur diesel in 2014, and the Shuaiba refinery was shut in 2017 to make way for the Clean Fuels Project.
KNPC's April 2025 merger with KIPIC, announced by Kuwait Petroleum Corporation, reshapes the refining company structure, so supplier registration may be under the merged entity.
Burgan's subsurface reservoirs were discovered in February 1938, and Kuwait Oil Company began commercial oil production there in 1946.
CITRA type approval for telecom equipment lasts three years and needs no local representative, while the Public Authority for Industry handles product safety registration.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Al Ahmadi. Classified areas in and around Al Ahmadi include refinery process units, oil gathering and processing, crude and product storage and marine loading facilities. KOC, KNPC or their engineers classify them, not SAMS. A specifier should ask the relevant operator for the zone drawing of the exact unit before choosing a device.
A distributor for Al Ahmadi would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are refinery process units, oil gathering and processing, crude and product storage, marine loading facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Al Ahmadi.
Kuwait Oil Company for field work and KNPC, now merging with KIPIC, for refinery work. Both run their own procurement and HSE approval processes, so ask each for the current procedure.
Summer highs average 42 to 46 degrees Celsius with a national record of 54, so use devices rated for high ambient temperatures and avoid leaving them in vehicles.
KOC and KNPC each run their own supplier registration and prequalification, KOC through its E-Business portal and KNPC through its eSourcing portal. A device supplier normally needs to be registered before it is considered. Confirm current requirements with the operator.
More on Al Ahmadi, and on other places in Kuwait.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.