Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Jubail · hazardous area

Hazardous Area Mobile Phone in Jubail

Jubail Industrial City covers just over 1,000 square kilometres on the Gulf coast of the Eastern Province and is managed by the Royal Commission for Jubail and Yanbu, established in 1975. The Royal Commission's chairman's office is in Riyadh, with separate directorates general in Jubail and Yanbu, so city-level services are run locally while plants set their own rules. If you are specifying a hazardous area mobile phone for Jubail Industrial City, this page covers the markings, the approvals and the current certification status of the IS-04Z1.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for Jubail, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topichazardous area
DeviceMobile Phone
RouteSpecification
WhereJubail

Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Jubail Industrial City: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.

Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.

At a glance · hazardous area

Checklist: hazardous area mobile phone for Jubail Industrial City

Specification checklist against the IS-04Z1 today
CheckWhat to look forIS-04Z1 today
Zone0, 1 or 2 for gas; 20, 21 or 22 for dustDesigned for Zone 1 and Zone 21
Gas groupIIA, IIB or IICIIC (target)
Area drawingThe operator's own classification drawingDecided by the site operator
Where it appliesJubail Industrial City: Refinery process units, Petrochemical and chemical plants, Storage and loading terminalsClassified by the site operator
Product · Jubail

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Jubail. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The site · Jubail Industrial City

Jubail Industrial City at a glance: who is there, what is classified

A short profile of the site and the kinds of classified area that matter for portable equipment.

Operators and companies on site

  • SABIC and affiliates
  • SATORP
  • Sadara Chemical Company
  • Kemya (Al-Jubail Petrochemical Company)

Classified areas to expect

  • Refinery process units
  • Petrochemical and chemical plants
  • Storage and loading terminals
  • Port bulk handling
Local conditions · Jubail Industrial City

Site conditions at Jubail Industrial City: what wears and what limits equipment

Climate

Hot desert climate with summer temperatures that can exceed 50 C.

Administration

The Royal Commission for Jubail and Yanbu runs the industrial city; each plant operator sets its own contractor rules.

Field notes · Jubail Industrial City

More about Jubail Industrial City that matters for portable equipment

Jubail Industrial City: people and language

Jubail had 474,679 residents in 2022, making it the third most populous city in the Eastern Province, so a large local workforce and service sector supports the plants.

Jubail Industrial City: logistics and access

Two main highways, the Dhahran to Jubail Highway and the Abu Hadriyah Highway, link the city to the rest of the Eastern Province.

Jubail Industrial City: infrastructure

The city hosts what is described as the world's largest independent water and power project, producing about 2,743.6 MW of electricity and 800,000 cubic metres of water a day.

Jubail Industrial City: industry on the ground

Associated gas from oil extraction is collected and processed by Aramco and piped to Jubail and Yanbu as petrochemical feedstock, so gas-handling and pipeline areas feed the plants.

The term · hazardous area

What “hazardous area” means for a smartphone

A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.

No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.

In Jubail Industrial City. Jubail's classified areas include refinery units, petrochemical and chemical plants, storage and loading terminals, utilities and gas processing, and port bulk handling. The plant operator classifies its own areas, not the Royal Commission and not SAMS. Obtain the plant's drawings before selecting a device.

The route · specification

Specifying a hazardous area mobile phone for Jubail

A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.

Check on the paper

Marking
Equipment group, category, protection concept, gas group and temperature class, matched to the area drawing.
Certificate and schedule
A certificate number, issuing body and the schedule of conditions, not a brochure claim.
Standards edition
The IEC 60079 or national standard edition the certificate was issued against.

Check for the IS-04Z1

Marking target
II 2 G Ex ib IIC T4: a target, not yet a certificate.
Certificate status
IECEx, ATEX, UKEX and NEC 500 in progress; none issued.
Operator approval
Separate from the certificate and handled with the site operator.
Questions · Jubail

Frequently asked questions

Can we buy a hazardous area mobile phone in Jubail today?

Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.

What does a hazardous area mobile phone in Jubail cost?

SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.

Which hazardous areas is the IS-04Z1 designed for?

Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.

Which areas at Jubail Industrial City would use it?

Likely candidates are refinery process units, petrochemical and chemical plants, storage and loading terminals, port bulk handling. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.

Is intrinsically safe the same as explosion proof?

Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.

Is Jubail one operator or many?

Many. The Royal Commission plans and runs the industrial city, but chemical, refining, power and port companies operate their own plants under their own safety and permit rules. Equipment approval for handheld devices is usually decided plant by plant.

Does Jubail's utility infrastructure create classified areas?

Gas-fired power and desalination plants usually include fuel-gas supply areas, so some classified zones are likely. The city's independent water and power project is among the largest in the world, so contractor numbers are high; confirm requirements with the specific plant.

Do approvals carry across plants in Jubail?

Not automatically. Each plant operator sets its own approved-vendor and permit rules, so approval at one plant does not guarantee acceptance at another. Confirm current requirements with the operator or its contractor for each plant. This applies on top of explosion-protection certification.

Enquiry · Jubail Industrial City

Ask about the IS-04Z1 for Jubail Industrial City, Saudi Arabia

Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.

Enquiry · Jubail Industrial City

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for Jubail?

Send the zone and gas group of your site and we will reply with the datasheet and schedule.