10th of Ramadan City
About 46 km from Cairo, it is reported to host 5,083 factories and around 353,656 jobs across electronics, food, pharmaceuticals, plastics, steel and other sectors.
Helwan, in southern Cairo, is the city's largest industrial centre, with iron and steel, cement and vehicle factories that developed into a major steelworks zone during the 1960s. They include the Cairo Oil Refining Company's Mostorod refinery in Qalyubia, Helwan Cement to the south, and the large industrial zone of 10th of Ramadan City. A hazardous area mobile phone distributor in Greater Cairo would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Greater Cairo has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Greater Cairo: Cement kiln fuel areas, Factory solvent and gas areas, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Cairo. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
About 46 km from Cairo, it is reported to host 5,083 factories and around 353,656 jobs across electronics, food, pharmaceuticals, plastics, steel and other sectors.
The refinery northeast of Cairo came onstream in 1973 and has a reported capacity of about 161,000 barrels per day.
Cairo International Airport in Heliopolis, about 15 km from the business district, covers roughly 37 square kilometres and is the busiest airport in Egypt, which helps urgent spares and visiting engineers reach the capital.
Natural gas made up 84% of Egypt's electricity mix in 2023, and Egypt produced 45% of Africa's gas-fired electricity in 2022, so gas-fired power stations and gas networks are the backbone of the national grid.
The Cairo Metro opened in 1987, is the oldest metro system in Africa and has over 1 billion passenger rides a year, so underground and railway systems are a major source of civil and electrical work.
Egypt's national oil company is the Egyptian General Petroleum Corporation, and Egypt has the sixth-largest proved oil reserves in Africa, over half of them offshore.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Greater Cairo. Hazardous areas around Cairo include refinery process units, fuel storage, cement kiln fuel areas and factory solvent and gas areas. Each operator classifies its own. The Egyptian Organization for Standardization and Quality is listed, but its hazardous-area role is not confirmed. SAMS does not classify areas.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Greater Cairo yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are refinery process units, fuel storage, cement kiln fuel areas, factory solvent and gas areas. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Greater Cairo.
Cairo is mainly a commercial and administrative hub, though the wider region has power stations, fuel depots and industrial plants with classified areas. Buyers and project teams often work from Cairo for sites elsewhere. Confirm the exact site and its zone classification with the operator.
Each operator and its parent organisation sets its own equipment approval and supplier registration, commonly asking for IECEx or ATEX certification against IEC 60079. Procedures differ between companies, so ask the procurement and HSE departments for current requirements and sample documentation.
Cairo itself is a city, and the relevant sites are in its surroundings: the Mostorod refinery in Qalyubia, Helwan Cement to the south, and factories in 10th of Ramadan City. Each has its own areas and rules. Ask the individual operator which zones exist and what equipment it accepts.
More on Cairo, and on other places in Egypt.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.