Poland: infrastructure
Bełchatów Power Station in the Łódź region supplies almost 20% of Poland's energy and is the largest brown coal power plant in the EU, a major example of a large dust-hazard site.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, built for the refinery, fertiliser and gas terminal work where Polish teams actually meet an explosive atmosphere. Buyers searching for an Ex-proof smartphone supplier for Poland can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An Ex-proof smartphone for Poland cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Poland: Police, Tarnów, Płock | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Poland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Poland market guide.
Bełchatów Power Station in the Łódź region supplies almost 20% of Poland's energy and is the largest brown coal power plant in the EU, a major example of a large dust-hazard site.
Solar energy expanded by 51.39% in 2023 and 26.61% in 2024 while hard coal fell 16.96% in 2024, and nuclear power is being introduced, so the types of site are changing.
The Płock refinery and petrochemical complex is the largest oil refinery in Poland, and Orlen's headquarters are in the same city, with servicing and construction firms clustered around the plant.
Coal use splits into 75.6% for electricity and heat, 14.5% for industry and 9.9% for buildings, so industrial coal consumers beyond power plants also have dust and gas hazards.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Poland. A marking check in Poland compares II 2 G Ex ib IIC T4 with the plant's classification. The gas marking target covers refineries and gas terminals, while Zone 21 dust protection belongs to the same programme. On a fertiliser site, the prilling tower, bagging hall and ammonia area can sit close together, so each area's zone must be confirmed.
There is no stock to order for Poland yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
The market guide for Poland covers Płock, Gdańsk, Włocławek, Puławy, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
Polish is the working language and ATEX instructions are typically expected in the language of the destination country. A Polish-language instruction sheet with certificate pack usually speeds up site acceptance. Ask the operator whether English documents are also accepted for contractors.
Poland is an EU member, so ATEX Directive 2014/34/EU applies to equipment and Directive 1999/92/EC to workplace zoning. Zone 1 and Zone 2 devices should carry CE and Ex markings with instructions in Polish. Operators and mines usually add their own approval rules.
The gas marking target is II 2 G Ex ib IIC T4, and Zone 21 dust protection belongs to the same programme, so one device is designed to cover both. Certification is in progress, so confirm the final marking and the plant's zone drawing with the operator.
Other guides for Poland, other places in Poland, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.